INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
31
4.
Using two clip nuts and two hex-head screws, attach the rail to the
rear of the rack (see Figure 12 and Figure 13).
The bottom rail uses positions 2 and 4 for the rear hex-head
screws. If you are installing additional rails, place the next rail
7 holes above the last installed screw.
Position 2
Position 4
Position 11
Position 13
First Rail
Second Rail
Figure 12. Rear Rail Screw Positions for the EBM
Clip Nuts
Figure 13. Securing the Rear Rail