Installing the IAC
3-27
EATON
Powerware
®
9390 IAC-B and IAC-T Installation and Operation Manual
S
164201590 Rev C
powerware.com
UPM 1
UPM 2
IAC
Figure 3-16. Two 100–160 kVA UPMs with Standalone IAC
6.
If permanently mounting the IAC, proceed to Step 9; otherwise, proceed to Step 7.
7.
Secure the IAC in position by lowering the leveling feet until the cabinet is not
resting on the casters and the cabinet is level.
8.
Proceed to paragraph 3.4.4.
9.
Using the retained hardware, reinstall the shipping brackets previously removed to
the front and rear of the IAC with the angle facing outward (see Figure 3-1 on
page 3-3 and Figure 3-2 on page 3-4).
10.
Secure the cabinet to the floor with contractor-supplied hardware.
11.
Proceed to paragraph 3.4.4.