![Eaton Powerware 9390 IAC-B Installation And Operation Manual Download Page 122](http://html1.mh-extra.com/html/eaton/powerware-9390-iac-b/powerware-9390-iac-b_installation-and-operation-manual_4272808122.webp)
013106
B
164201590---6
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
IAC POWER TERMINAL LOCATIONS
AC OUTPUT
FROM BIB
TO UPS
PHASE C
PHASE B
PHASE A
BIB
120/100 AND 120/120 kVA 208V/208V
MAINTENANCE BYPASS CONFIGURATION
BIB TERMINAL DETAIL
PHASE C
PHASE B
PHASE A
AC OUTPUT
FROM RIB TO
UPS RECTIFIER
PHASE C
PHASE B
PHASE A
AC INPUT TO RIB
FROM UTILITY
RIB
11 of 22
Installation Information
A-44
EATON
Powerware
®
9390 IAC-B and IAC-T Installation and Operation Manual
S
164201590 Rev C
powerware.com
Summary of Contents for Powerware 9390 IAC-B
Page 145: ......
Page 146: ...164201590C 164201590 C...