![Eaton Powerware 9390 IAC-B Installation And Operation Manual Download Page 113](http://html1.mh-extra.com/html/eaton/powerware-9390-iac-b/powerware-9390-iac-b_installation-and-operation-manual_4272808113.webp)
013106
B
164201590---6
IAC POWER TERMINAL LOCATIONS
GROUND TERMINALS
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
GROUND TERMINALS
NEUTRAL TERMINALS
NOTE:
1. Metal shields covering wiring
terminals must be removed to gain
access to terminals.
2. 100 kVA model must be wired for
120 kVA.
120/100 AND 120/120 kVA 208V/208V
MAINTENANCE BYPASS CONFIGURATION
WITH OR WITHOUT BIB AND RIB OPTIONS
AC INPUT FROM UPS (A, B, C)
AC OUTPUT FROM BIB
TO UPS (A, B, C)
AC OUTPUT FROM RIB TO
UPS RECTIFIER (A, B, C)
MAINTENANCE
BYPASS SWITCH (MBP)
(SEE SHEET 9 of 22
FOR DETAILS)
MAINTENANCE
ISOLATION SWITCH (MIS)
OPTIONAL BYPASS
INPUT BREAKER (BIB)
(SEE SHEET 9 of 22 FOR DETAILS)
AC OUTPUT TO CRITICAL LOAD
(A, B, C)
AC INPUT TO BYPASS
FROM UTILITY (A, B, C)
OPTIONAL RECTIFIER
INPUT BREAKER (RIB)
AC INPUT TO RIB FROM
UTILITY (A, B, C)
(SEE SHEET 11 of 22
FOR DETAILS)
(SEE SHEET 11 of 22 FOR DETAILS)
(SEE SHEET 9 of 22 FOR DETAILS)
(SEE SHEET 11 of 22 FOR DETAILS)
2 of 22
Installation Information
A-35
EATON
Powerware
®
9390 IAC-B and IAC-T Installation and Operation Manual
S
164201590 Rev C
powerware.com