UPS System Installation
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual 164201725—Rev 10
www.eaton.com/powerquality
4-9
Figure 4-8. ISBM and UPM Sections Joined (Three UPM Section Shown)
10. Reinstall the left top panel (see Figure 4-7) and secure using the retained hardware.
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle panel of the UPM section).
Locate two flat brackets and screws from the hardware kit. Align the holes in the flat brackets over holes
in the top rear and top front of the ISBM and UPM sections. Secure the brackets with the screws from the
hardware kit (see Figure 4-9).
12. Locate one flat bracket and screws from the hardware kit. Align the holes in the flat bracket over holes in
the front base of the ISBM and UPM sections. Secure the bracket with the screws from the hardware kit
(see Figure 4-9).
UPM Wireway
(Power wiring harnesses are coiled in this area.)
NOTE
Three flat cabinet joining brackets are provided in the hardware kit for securing the
ISBM and UPM sections at the top front, top rear, and front base (see Steps 11 and
12).
Summary of Contents for Power Xpert 9395 UPS
Page 2: ......
Page 27: ...Installation ...
Page 28: ......
Page 123: ...Section 2 Operation ...
Page 124: ......
Page 249: ......
Page 250: ... 164201725 10 164201725 10 ...