UPS System Installation
4-8
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual 164201725—Rev 10
www.eaton.com/powerquality
Figure 4-7. Section Joining (Three UPM Section Shown)
5.
Remove the screws securing the left top panel and remove the panel (see Figure 4-7). Retain the
hardware for later use.
6.
Remove the screws securing the left middle panel and remove the panel (see Figure 4-7). Retain the
hardware for later use.
CAUTION
Use care during installation to protect components mounted on the right side of the ISBM section and
the intercabinet wiring harnesses attached to the left side UPM section from damage.
7.
Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side
of the previously installed UPM section. Verify that the ISBM section right side is against the UPM section
left side and the front of the cabinet bases are flush with each other (see Figure 4-8).
8.
Reinstall the corner channel (see Figure 4-7) and secure using the retained hardware.
9.
Reinstall the left middle panel (see Figure 4-7) and secure using the retained hardware.
Left Top Panel
Wireway Panel
Left Middle Panel
Corner Channel
UPM Section
Interior Left
Side Panel
NOTE
Clearance between the ISBM and the UPM sections must be less than 1/2” so that
joining brackets can be installed.
Summary of Contents for Power Xpert 9395 UPS
Page 2: ......
Page 27: ...Installation ...
Page 28: ......
Page 123: ...Section 2 Operation ...
Page 124: ......
Page 249: ......
Page 250: ... 164201725 10 164201725 10 ...