UPS System Installation
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual 164201725—Rev 10
www.eaton.com/powerquality
4-43
Distributed Bypass Installation Checklist
o
Each cabinet in the distributed bypass system is placed in its installed location.
o
All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel.
o
All power cables are properly sized and terminated.
o
A ground conductor is properly installed.
o
Controller Area Network (CAN) wiring between the UPS cabinets is properly installed.
o
Pull-chain wiring between the UPS cabinets is properly installed.
o
Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets.
o
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
Summary of Contents for Power Xpert 9395 UPS
Page 2: ......
Page 27: ...Installation ...
Page 28: ......
Page 123: ...Section 2 Operation ...
Page 124: ......
Page 249: ......
Page 250: ... 164201725 10 164201725 10 ...