With the Fluidic Factory disconnected from the mains
electricity, the Print Head can be fitted. Check that the
Interface Plate on the core Fluidic Factory is in its
upper position. If it is not already, manually pull the
Interface Plate upwards until the Release Catch is
above the case work as shown. See Figure 7 for the
correct position and Figure 8 for the incorrect position.
Align the two lugs at the bottom of the Print Head with
the recess on the interface plate. See Figure 9.
Push the Print Head whilst pushing in the release and
fitting catch. See Figure 10.
Figure 9
Figure 10
Figure 7
Figure 8