16
NOTE: If you have purchased a computer from dmt with your pressure myograph system
then myoview data, acquisition software has already been installed with drivers for the
digital usb camera. Follow the next procedure to setup the pressure myograph system
NOTE: If you have not purchased a computer from dmt follow the myoview quick
installation guide to install myoview on your own computer
5. Pressure Interface to external Data Acquisition System connection (optional): If you have not obtained
the MyoVIEW software the four BNC ports on the rear of the Pressure Interface enables connection of
an external data acquisition system for recording inlet pressure P1, outlet pressure P2, longitudinal
force, probe temperature, chamber temperature, flow ON/OFF, pressure ON/OFF, pH1 value and
(Optional Dig out1, Dig out2, Dig in1 dig in2).
6. Turn on the power: Turn the main power to the Pressure Interface on at the power switch. Then turn
on the computer and the Pressure Myograph System is now ready to for use with MyoVIEW Data
Acquisition Software.