ASE 150 Operator’s Manual
16
Doc. 065207-02 9/08
•
The drain directs solvent spills from the bottle area on top of the ASE 150 to
the rear panel. A drain hose connects to the fitting. For installation
instructions, see
2.3
ASE 150 Extraction Process
Preparing to Run an Extraction
The following steps are required before the ASE 150 can perform an extraction.
Refer to
for detailed instructions for each step.
•
Fill the solvent reservoir.
•
Prepare the sample and load it into the sample cell.
•
Install the waste bottle and collection vessel.
•
Select or create a method.
•
Press the
START
button.
•
Verify that the
STATUS
on the
STATUS
screen is
OVEN READY
and the LED on the
START
button is flashing.
•
Install the sample cell in the cell holder and close the cell door.
•
Press the
START
button.
Summary of Contents for ASE 150
Page 32: ...ASE 150 Operator s Manual 24 Doc 065207 02 9 08...
Page 64: ...ASE 150 Operator s Manual 56 Doc 065207 02 9 08...
Page 76: ...ASE 150 Operator s Manual 68 Doc 065207 02 9 08...
Page 114: ...ASE 150 Operator s Manual 106 Doc 065207 02 9 08...
Page 132: ...ASE 150 Operator s Manual 124 Doc 065207 02 9 08...