3 • Operation and Maintenance
Doc. 065207-02 9/08
45
3.2.6
Completing the Run
1. Verify that a collection vessel and a waste bottle are installed (see
and
); the needle switch is down; and the
cell, collection vessel, and waste bottle doors are closed.
2. Press
START
to begin the run. A typical run takes 15 to 25 minutes.
3. Monitor the run on the
STATUS
screen (see
4. When the run is complete, three beeps are emitted, the
START
LED
turns off, and the
STATUS
screen displays
IDLE
.
5. Toggle the needle switch to the
UP
position and remove the collection
vessel containing the extract from the holder. Refer to
post-run procedures.
6. Put on the thermal gloves (P/N 060372) provided in the ASE 150
Ship Kit (P/N 066399).
7. Remove the cell from the cell holder and place it on the cell rack
(P/N 059927) to cool.
8. Close the cell door until the next run, to save energy and prevent
anyone from accidentally touching a hot surface.
Do not attempt to open the cell door while a run is in progress.
N'ouvrez pas la porte pendant une extraction.
Halten Sie die Tür während der Extraktion geschlossen.
Cells are extremely hot after a run. Be especially cautious with cells
that have been heated over 50 °C (122 °F).
Les cellules sont extrêmement chaudes après une extraction. Faites
particulièrement attention aux cellules qui ont été chauffées à plus de
50 °C.
Die Zellen sind nach ihrer Entnahme sehr heiß. Seien Sie besonders
vorsichtig, wenn Zellen über 50°C erhitzt wurden.
Summary of Contents for ASE 150
Page 32: ...ASE 150 Operator s Manual 24 Doc 065207 02 9 08...
Page 64: ...ASE 150 Operator s Manual 56 Doc 065207 02 9 08...
Page 76: ...ASE 150 Operator s Manual 68 Doc 065207 02 9 08...
Page 114: ...ASE 150 Operator s Manual 106 Doc 065207 02 9 08...
Page 132: ...ASE 150 Operator s Manual 124 Doc 065207 02 9 08...