B • Installation
Doc. 065207-02 9/08
109
4. Adjust the nitrogen
pressure source to
between 0.97 and
1.38 MPa (140 and
200 psi); 1.03 MPa
(150 psi) is
recommended.
5. Push one end of the clear
8-mm (0.312-in) OD
tubing (P/N 053514) into
the
VENT
6. (
Optional
) Route the free
end of the vent tubing to a
vent hood.
Figure B-1. ASE 150 Rear Panel
Do not obstruct or pressurize the vent outlet.
Ne bouchez ni ne mettez sous pression la sortie d'aération.
Halten Sie den Lüftungsauslaß frei, setzen Sie ihn nicht unter Druck.
Make sure the vent tubing runs downhill from the ASE 150 rear panel.
This prevents formation of a trap, which would prevent vapors from
being vented through the tubing.
Vent
Nitrogen
Drain
Summary of Contents for ASE 150
Page 32: ...ASE 150 Operator s Manual 24 Doc 065207 02 9 08...
Page 64: ...ASE 150 Operator s Manual 56 Doc 065207 02 9 08...
Page 76: ...ASE 150 Operator s Manual 68 Doc 065207 02 9 08...
Page 114: ...ASE 150 Operator s Manual 106 Doc 065207 02 9 08...
Page 132: ...ASE 150 Operator s Manual 124 Doc 065207 02 9 08...