EN
O P E R AT I O N
DiBO 22
HARDNESS (IN °F)
HARDNESS (IN °D)
POSITION PUMP
15
8.4
1
20
11.2
2
25
14
3
30
16.8
4
35
19.6
5
40
22.4
6
45
25.2
7
Depending on the scale deposits the pump may be put to the middle position (1
liter = 3h 55 mins.). Adjust the other settings experimentally according the local
hardness / application / cleaning temperature.
Attention: always set the softener pump
to position: on, do not turn off!
The burner can still work approx. 2 hours before the PLC switches off the burner.
During these 2 hours, the reset button will start flashing (or display a message)
to indicate that the softening product is running dry. The softener pump will not
work at using cold water but jumps automatically on when the burner motor is
activated and the pump will work during xx sec. when the motor is deactivated!
The softener pump has also a run dry protection of the softening tank.
Consult, if necessary, the delivered safety data sheet (1.837.900) of
the softener product. Check the measures on exposure controls/
personal protection / first aid measures / firefighting measures.
23 A I R V E N T I N G VA LV E P U M P
The air vent valve allows purging the pump. Open the valve to bleed air.
Note: only purging when suction conduit is filled with water, therefore first
completely fill the water tank before purging the pump. Always close the valve
back again after the bleeding process!
24 A D J U S T M E N T VA LV E BY PA S S
Through the adjustment valve one can regulate the bypass pressure so that the
pressure control valve is functioning properly (eg when working at high altitude).
This valve is factory set.
25 O V E R F L O W VA LV E
The overflow valve is attached to the water tank on the frame.
This valve ensures that a constant pressure remains present in the bypass line.
This valve is factory set.
26 T R AC K & T R AC E ( O P T I E )
The trailer can be equipped with a tracker. The necessary information/data can
be achieved via a login on the tracker website. Also use/reed the delivered
manual of the tracker (1.780.510).
Pay attention: when you want to use the Track & Trace, first
reconnect the tracker to the battery of the trailer. This can
happen by inserting the delivered fuse of 1A in the fuse holder
“XF4” (in the control box) whereby the tracker will charge.
When the tracker has power supply, the tracker will attempt to connect to GPS
satellites, which will update the date and time and the device will receive the
correct settings again after which it will send all the logged data to the platform.
The SIM card must have a connection with a mobile phone network to send all
relevant data.