2.5 The smoke pipe 

 
The smoke pipe must be in compliance with the NF P 51-
201 (D.T.U. 24.1) standard. 

 

Height of the smoke pipe stack (Fig. 3) 
Canting of the smoke pipe (Fig. 4) 

 

The current pipe :  
-  The  pipe  must  be  in  good  shape  and  must  allow  a 
sufficient draught (optimum depression 15 to 20 Pa).  
- The pipe must fit its use, if this is not the case it will be 
necessary  to  proceed  to  a  tubing  or  a  jacketing  of  the 
pipe. 
- The pipe must be clean ; proceed with a sweeping with 
a metallic flue brush to eliminate the deposits of soot and 
remove wood tars.  
-  The  pipe  must  have  a  sufficient  thermal  insulation ; 
because  when  a  pipe  has  cold  linings  it  is  impossible  to 
get a thermal draught and it leads to condensation. 
-  The  smoke  pipe  must  be  waterproof  and  of  normal 
section  and  constant  in  its  whole  height  (example  4dm2 
to be used in an open fireplace and 2,5 dm² to be used in 
a closed fireplace).  

 

The thermal draught may become impossible because of 
a too large pipe.  
- The pipe must be joined up to one equipment only.  
- It must be 6-7 meters high and must come out at least 
40 cm above any constructed parts 8 meters away. 
In the case of a flat roof or when the slope of the roof is 
less than 15°, the stack must equal 1,20m  (Fig. 3). 
The chimney head must not stop the draught. 
- If the chimney tends to have discharges, because of its 
situation 

regarding 

surrounding 

impediments, 

we 

recommend  you  to  cap  the  chimney  with  a  draught 
diverter

 

or raise up the chimney. 

-  If  the  chimney’s  depression  exceeds  30  Pa,  a  draught 
moderator must be installed on the chimney connector. 

 

Chimney to be built / non-existent pipe.  
- The chimney pipe must not lay on the fireplace. 
-  It  must  be  kept  away  from  any  inflammable  material 
(framework, woodwork, light partition…) 
- It must leave the possibility for a mechanical sweeping. 
 
 

2.6 Joining up to the smoke pipe (Fig. 6) 

 
-  The  equipment  will  be  joined  to  the  smoke  pipe  by 
smoke pipes from the accepted trade to resist products of 
wood  combustion  (for  example :  stainless  steel, 
enamelled sheet steel. 
-  The  pipe’s  diameter  must  not  be  inferior  to  the  blast 
pipe’s  diameter  of  the  equipment.  If  it  is  the  case,  the 
reduction  must  be  of  an  immediately  inferior  diameter  of 
the blast pipe and it must be located the farthest possible 
from the connect to the equipment.  
-  The  joining  must  vertically  be  done  on  a  pipe  leading 
under the ceiling. 
-  The  jointing  of  the  joining  pipe  to  the  blast  pipe  of  the 
equipment  as  well  as  to  smoke  pipe  will  be  tight.  As  far 
as  accommodation  equipped  with  a  CMV  (Controlled 
Mechanical Ventilation) to the blast pipe’s one and it must 
be  located  as  far  as  possible  from  the  joining  to  the 
equipment. 

-  The  chimney  connector  and  the  draught  moderator  (if 
necessary)  must  be  visible,  accessible  and easily swept. 
Allow for a maintenance door (500 x 350 mm) in the hood 
to  access  the  chimney  connector  as  well  as  all  pipes, 
connectors, gate valves… 

 

2.7  Chimney  built  around  the  fireplace    
(Fig. 5) 

 
-  The  chimney  must  conform  to  the  current  DTU  24.2.2 
Standard. 
- Respect the assembly instructions by the manufacturer 
of the chimney. 
- Do not wedge the appliance. 
-  Check  the  right  operation  of  the  mobile  parts  (valve, 
door…)  to  avoid  the  sticking  of  the  start  up  elements 
(plaster, cement). 
 

2.8 Connection to the central heating 

 
2.8.1 Connection of the equipment Fig. 1 

 

Return: 

 

 Connect  the  picking  26/34  plug  located at the bottom of 
the  equipment  at  the  return  of  the  installation  of  the 
central heating circuit. 

 

Start:  
 Connect  the  26/34  connector  situated  at  the  top  of  the 
appliance  to  the  starting  point  of  the  central  heating 
system circuit. 

 
 

Do not block up any of these pickings. 
 
The  start  and  return  piping  must  not  be  equipped 
with any stop or severing valve. 

 
 

2.8.2 Basic principle of joining 
 
-  In  any  case  the  heating  engineer  is  liable  for  the 
connecting to be done. 
 
Expansion tank :  
Installing an expansion pan on a closed or open circuit is 
compulsory.  Its  sizing  and  positioning  must  be  in 
compliance with the DTU 65-1 1 standards. 
 
Safety valve :  
As  well  as  the  expansion  pan,  a  safety  valve  complying 
with the French Standard NF P 52-001 must be installed 
(NF E 31-010 Standard). It must be directly connected to 
the  upper  outlet  of  the  appliance  and  its  exhaust  outlet 
must be oriented in such a way that no bodily injury may 
occur (see Fig. 8, 9 and 10). 
In particular, there must be no connection tube or total or 
partial blockage and control units between the apparatus 
and  the  safety  valve  (§4.2.2.2  of  standard  NF  P  52-203 
DTU 65-11). 

 

Thermal valve feed discharge :  
When  the  system  is  fitted  with  an  under  pressure 
expansion  pan  on  a  closed  circuit,  the  appliance  outlet 
must  be  fitted  with  a  thermal  relief  valve  with  its 
temperature sensor. 

 

16 

Summary of Contents for C07910-A

Page 1: ...D ACQUA HOGAR CERRADO DE CIRCULACI N DE AIRE LAREIRA FECHADA A CIRCULA O DE GUA C07910 A NOTICE D INSTALLATION ET D UTILISATION INSTALLATION AND UTILISATION MANUAL ISTRUZIONI PER L INSTALLAZIONE E L U...

Page 2: ...FRAN AIS 3 ENGLISH 12 ITALIANO 21 ESPA OL 30 PORTUGU S 39 2...

Page 3: ...d installation 6 2 4 Le local d implantation 6 2 5 Le conduit de fum e 7 2 6 Raccordement au conduit de fum e 7 2 7 Chemin e construite autour du foyer 7 2 8 Raccordement au chauffage central 7 2 9 En...

Page 4: ...tre existant Cet appareil est quip d un bouilleur une partie de la chaleur est transmise la pi ce par convection et rayonnement et l autre permet la production d eau chaude Relever le num ro de s rie...

Page 5: ...t Puissance calorifique nominale en fonctionnement continu 14 kW Obtenue sous un tirage de 12 Pa au cours d une dur e de feu de 1 heure avec une charge de 4 4 kg de bois dur non fendu charme ch ne de...

Page 6: ...ations de g nie climatique DTU 60 5 Arr t du 22 octobre 1969 Conduit de fum e desservant les logements Arr t du 22 octobre 1969 et Arr t du 24 mars 1982 A ration des logements Rappel La pr sence sur l...

Page 7: ...st le cas la r duction doit tre de diam tre imm diatement inf rieur au diam tre de la buse et tre situ e le plus loin possible du raccordement l appareil Le raccordement doit se faire verticalement su...

Page 8: ...ssionnel V rifier compl tement l tat de l appareil et en particulier les l ments assurant l tanch it joints et organes de verrouillage pi ces d appui porte ch ssis V rifier l tat du conduit de fum e e...

Page 9: ...Lorsque la charge de petit bois est bien enflamm e ouvrir la porte charger l appareil avec le combustible recommand 3 2 Entretien Ramonage Vidange Tr s important afin d viter tout incident feu de chem...

Page 10: ...ille d entr e d air frais ext rieure Le tirage est insuffisant Ouvrir momentan ment la cl de buse V rifier que le conduit n est pas obstru effectuer un ramonage m canique si n cessaire V rifier que le...

Page 11: ...lle ci dans les d lais impartis A d faut la date figurant sur la facture mise par DEVILLE ne peut tre prise en consid ration Les interventions au titre de la garantie ne peuvent avoir pour effet de pr...

Page 12: ...on installation requirements 15 2 4 Place of installation 15 2 5 The smoke pipe 16 2 6 Joining up to the smoke pipe 16 2 7 Chimney built around the fireplace 16 2 8 Connection to the central heating 1...

Page 13: ...in an existing hearth This device has a built in boiler a portion of the heat is conveyed to the part through convection and radiation and the other to produce hot water Note the serial number written...

Page 14: ...s so higher heat 1 4 Operating conditions Nominal heating power during continuous service Obtained with a draught of 12 Pa for 1 hour burning time with a 4 4 kg load of hard unsplit wood oak hornbeam...

Page 15: ...and hot water supply waste water and rainwater evacuation installations of climatic engineering DTU 60 5 Order of 22nd October 1969 Smoke pipes supplying accommodation Order of 22nd October 1969 Orde...

Page 16: ...le from the connect to the equipment The joining must vertically be done on a pipe leading under the ceiling The jointing of the joining pipe to the blast pipe of the equipment as well as to smoke pip...

Page 17: ...refully check the condition of the appliance and more especially smoke tightness seals fixings and door and frame Check the condition of the smoke flue and the connecting pipe all fittings should be i...

Page 18: ...box When the kindling is alight open the door and put in the wood recommended above 3 2 Maintenance Sweeping Evacuation Very important to avoid all accidents chimney fire etc standard upkeep must be...

Page 19: ...y air Open wide the primary air vent Open the grid to let in fresh air from outside Insufficient draft Temporarily open the draft shutter Check the flue has no obstruction carry out mechanical sweepin...

Page 20: ...be returned to the latter within the required time For lack of this the date on the invoice issued by Deville can t be taken into account The interventions under warranty can t have the effect of cont...

Page 21: ...zione 24 2 4 Il locale d impianto 24 2 5 La canna fumaria 25 2 6 Raccordo alla canna fumaria 25 2 7 Camino costruito intorno al focolare 25 2 8 Raccordo al riscaldamento centrale 25 2 9 Manutenzione d...

Page 22: ...Quest apparecchio accessoriato di un bollitore una parte del caldo viene trasmessa alla stanza tramite convezione e irraggiamento e l altra parte permette la produzione d acqua calda Riportare nella c...

Page 23: ...Potenza calorifica nominale in funzionamento continuo 14 kW Potenzialit ottenuta con un tiraggio pari a 12 Pa nel corso di una prova di combustione della durata di 1 ore Il fuoco stato alimentalo con...

Page 24: ...usso delle acque di fogna delle acque di pioggia impianti di ingegneria climatica DTU 60 5 Ordinanza del 22nd Ottobre 1969 Canna fumaria che serve le abitazioni Ordinanza del 22 Ottobre 1969 e del 24...

Page 25: ...uato verticalmente su un condotto sboccando sotto il soffitto L incastramento del condotto di raccordo sull ugello dell apparecchio cos come sulla canna fumaria verr effettuato in modo che sia stagno...

Page 26: ...re Io stato della canna fumaria e del tubo di raccordo tutti i collegamenti devono presentare una buona tenuta stagna e conservera l ermeticit Pulire con aspiratore l interno della cappa per evitare l...

Page 27: ...atura dell aria primaria situata al livello del cinerario Quando la legna fine si infiammata aprire la portina e alimentare il focolare con il combustible consigliato 3 2 Manutenzione Pulitura Svuotam...

Page 28: ...d aria fresca esteriore Tiraggio insufficiente Momentaneamentei aprire la valvola di tiraggio Verificare che la canna non sia otturata effettuare se necessario una pulitura meccanica Verificare che la...

Page 29: ...re rispedito a DEVILLE nei termini assegnati In mancanza di questo la data figurando sulla fattura emessa da DEVILLE non pu essere presa in considerazione Gli interventi a titolo della garanzia non po...

Page 30: ...instalaci n 33 2 5 El conducto de humos 34 2 6 Conexi n al conducto de chimenea 34 2 7 Chimenea construida alrededor del hogar 34 2 8 Conexi n a la calefacci n central 34 2 9 Mantenimiento de la chim...

Page 31: ...a a construir o que ya exista Este aparato est equipado de un hervidor y una parte del calor es echada por convecci n y radiaci n y la otra parte permite producir agua caliente Anota el n mero de seri...

Page 32: ...r fica nominal en funcionamiento continuo 14 kW Lograda con un tiro de 12 Pa durante un per odo de fuego de 1 horas con una carga de 4 4 kg de le a no hendida haya roble etc de 7 cm de di metro aproxi...

Page 33: ...a y agua caliente evacuaci n de las aguas sucias del agua de lluvia instalaci n de ingenier a clim tica DTU 60 5 Decreto del 22 de octubre de 1969 Conducto de humos que abstece las viviendas Decreto d...

Page 34: ...iene que hacerse verticalmente sobre un conducto que da al techo La uni n del conducto de conexi n sobre la tobera del aparato y sobre el conducto de chimenea tiene que realizarse de manera estanca pa...

Page 35: ...r Verificar el estado del conducto de humo y del conducto de empalme todos los empales deben presentar una buen resistencia mec nica y haber conservado su estanquidad Limpiar con aspirador el interior...

Page 36: ...ero En cuanto se encienda bien la le a menuda abrir la puerta y cargar el aparato con el combustible recomendado 3 2 Mantenimiento Deshollinamiento Vaciado Muy importante para evitar todo tipo de prob...

Page 37: ...resco exterior Tiro insuficiente Abrir un momenito la ventanilla del tiro Verificar que el conducto no est obstruido y proceder a un hollinamiento mec nico que resulta necesario Controlar que el condu...

Page 38: ...e la solicitud de reparaci n del aparato bajo garanti o bien un tal n o un volante suelto de este certificado debe seg n la organizaci n propia de DEVILLE ser devuelto a este en los plazos impartidos...

Page 39: ...a o 42 2 4 O local da implanta o 42 2 5 A conduta do fumo 43 2 6 A liga o a conduta do fumo 43 2 7 Chamin constru da ao redo da lareira 43 2 8 Liga o ao aquecimento central 43 2 9 Conserva o da chamin...

Page 40: ...est equipado de um elemento que permite aumentar a superf cie de aquecimento uma parte do calor transmitida pe a por convec o e radia o e a outra parte permite a produ o de gua quente Ler o n mero de...

Page 41: ...ncia calor fica nominal em funcionamento cont nuo 14 kW Obtida com uma tiragem de 12 Pa durante um tempo de fogo de 1 hora com uma carga de 4 4 kg de lenha dura n o rachada b tula carvalho com de cerc...

Page 42: ...Distribui o de gua fria e quente sanit ria evacua o das guas gastas das guas da chuva instala es de g nio clim tico DTU 60 5 Portaria do 22 outubro 1969 Condutas dos fumos dos alojamentos Portaria do...

Page 43: ...i metro do canal de in cio do aparelho Se o caso a redu o deve s r de di metro imediatamente inferior ao di metro do canal de in cio e estar situada o mais longe poss vel da liga o do aparelho A liga...

Page 44: ...ficar totalmente o estado do aparelho e em particular os elementos que asseguram a veda o juntas e rg os de fecho pe as de apoio porta chassis Verificar o estado da conduta de fumos e da conduta de li...

Page 45: ...vel do cinzeiro Quando a carga de lenha pequena estiver bem acesa abrir a porta e carregar o aparelho com o combust vel recomendado 3 2 Conserva o Limpeza Esvaziamento Muito importante para evitar qu...

Page 46: ...rir a grelha da entrada do ar fresco exterior A tiragem insuficiente Abrir momentaneamente a taipa da tiragem Verificar que a conduta n o est obstruida se necess rio efetuar uma limpeza mec nica Verif...

Page 47: ...e enviado a Deville no prazo concedido Em falta desses documentos a data figurada em cima da factura emitida por Deville n o pode s r presa em considera o As interven es ao titulo da garantia n o pode...

Page 48: ...um es Smoke evacuation Evacuazione dei fumi Evacuacion de los humos Evacua o dos fumos Convection Convection Convezione Convecci n Convec o Cl de buse Flue baffle Registro di tiraggio Llave de tobera...

Page 49: ...Veiller ce que l air de convection puisse entrer librement sous l appareil sur toute la p riph rie circuler autour du foyer sur les c t s et l arri re et s vacuer par les bouches de diffusion de la h...

Page 50: ...la cappa Una buona circolazione dell aria di convezione permette uno scambiodin calore ottimo con le pareti del focolare senzasovrariscaldamento locale e una buona ventilazione della cappa Entrada del...

Page 51: ...llerette scell e Sealed flange Flangia sigillata Cuello fijado Colarinho selado 6 Le conduit ne d passe pas la collerette et l embo tement est au moins gal 40 mm The pipe is not longer than the flange...

Page 52: ...ec sonde Thermic valve supply discharge with probe Valvola termica alimentazione scarica V lvula t rmica alimentaci n descarga con sonda V lvula t rmica de alimenta o e descarga com sonda 5 Circulateu...

Page 53: ...n descarga con sonda V lvula t rmica de alimenta o e descarga com sonda 5 Circulateur Circulation pump Circolatore Circulador Circulador 6 Purgeur automatique Automatic drain cock Spurgatore automati...

Page 54: ...e alimenta o e descarga com sonda 5 Circulateur Circulation pump Circolatore Circulado Circulador 6 Purgeur automatique Automatic drain cock Spurgatore automatico Purgador autom tico Purgador autom ti...

Page 55: ...Fig 11a Fig 11b 55...

Page 56: ...erzeit abzu ndern oder zu verbessem Le descrizioni e le caratteristiche comprese nel presente documento sono a titolo informativo e non impegnativo Infatti interessati sempre alla qualit dei nostri pr...

Reviews: