![Dell EMC PowerProtect DD9400 Installation Manual Download Page 24](http://html1.mh-extra.com/html/dell-emc/powerprotect-dd9400/powerprotect-dd9400_installation-manual_2468365024.webp)
Install the front bezel
The procedure to install the front bezel with the LCD panel and the front bezel without the LCD panel is the same.
Steps
1. Align and insert the right end of the bezel onto the system.
2. Press the release button and fit the left end of the bezel onto the system.
3. Lock the bezel by using the key.
Figure 18. Installing the front bezel
Install the CMA arms
Steps
1. Install the first separator on the bracket.
24
Install the System in the Rack
Summary of Contents for PowerProtect DD9400
Page 1: ...Dell EMC PowerProtect DD9400 System Installation Guide September 2020 Rev 03...
Page 57: ...Figure 65 Single node DD9400 with DS60 shelves Connect Cables and Power On 57...
Page 58: ...Figure 66 HA DD9400 with DS60 shelves 58 Connect Cables and Power On...
Page 63: ...Figure 72 Routing cables through the CMA brackets Connect Cables and Power On 63...