Design Guide | iC7 Series Air-cooled System Modules
3
4
6
5
e3
0b
l5
53
.1
0
1
2
Figure 51: Connecting the Fieldbus Cable and the Fiber Cables
1
PLC (not included in the delivery)
2
Fieldbus cable
3
Control board
4
Star coupler board
5
Fiber cables
6
Power units
8.15
Installing the Control Cables into the Control Terminals
1.
Install the control cables into the control terminals.
See the pin numbering of the I/O and Relay Option in
8.8 I/O and Relay Option Connections
e3
0b
j0
31
.1
0
1
2
3
Figure 52: Example of Installing the Control Cables
1
Control cable
2
Cable clamp
3
Grounding plates
2.
Strip the control cables. Attach the control cables to the cable clamps on the suitable grounding plate.
Danfoss Drives Oy © 2024.03 AJ389643111587en-000101 / 172F6361A |
71