22
Dakewe (Shenzhen) Medical Equipment Co., Ltd
B.Move the packing box to the
unpacking place
(1) Before unpacking, check whether the fasteners of
the packing box are complete, whether the appearance is
damaged or deformed, etc. If the above happens, please
mark the shipping documents accordingly and check
whether the goods are damaged.
(2) Move the instrument packing box as close as
possible to the final installation site.
C
.
Remove the top cover
(1) Remove the 6 fastening screws of the top cover with
No. 14 metric or adjustable open-end wrench, and
remove the cover and top foam by two persons.
D. Remove the four-side protective
plate
1) Use metric No. 14 or an adjustable open-end
wrench to remove the 14 fastening screws of the 4
front and left protective plates in turn, remove the
4 protective plates, and take out the bottom
accessories;
2) Remove the protective foam on the four sides,
break the brake pads of the casters by hand, and
release the casters.
E. Top plate and base splicing
1) Place the top plate upside down and join the
Summary of Contents for HP300 Plus
Page 1: ...HP300 Plus Automatic Tissue Processor User s Manual Revision V1 4 English Version Jan 2023...
Page 21: ...Dakewe Shenzhen Medical Equipment Co Ltd 17 necessary...
Page 67: ...Dakewe Shenzhen Medical Equipment Co Ltd 63 Figure 56...