Dakewe (Shenzhen) Medical Equipment Co., Ltd
23
wooden box base, and then drag out two guide rails
from the bottom of the equipment to join the top
plate;
2)
Push the equipment off the pallet. When pushing
the instrument down from the pallet, one person
should hold the two outer corners with both hands
to support the instrument; the other person should
firmly hold the two handles on the back of the
instrument, and slowly push the instrument from
the pallet along the slope of the guide rail. under.
3) After placing it in place, remove all the foam from
the machine.
At least two people are required to unpack and transport the instrument.
After disassembling the wooden strips fixing the casters of the tissue processor,
release the brake of the casters of the dehydrator.
The equipment casters are very easy to move, and the empty weight of HP300 Plus is
180kg. When pushing the equipment off the pallet through the ramp, one person
supports both sides of the marble countertop of the machine in front, and the other holds
the moving handle behind, Slowly slide the machine from the base to the ground along
the slope.
·
Check the received parts according to the attached packing list to confirm whether the
delivery is complete! If any discrepancies are found, contact Dakewe or your local
distributor immediately.
To prevent damage to the instrument or samples, only accessories and spare parts
authorized by Dakewe can be used.
Summary of Contents for HP300 Plus
Page 1: ...HP300 Plus Automatic Tissue Processor User s Manual Revision V1 4 English Version Jan 2023...
Page 21: ...Dakewe Shenzhen Medical Equipment Co Ltd 17 necessary...
Page 67: ...Dakewe Shenzhen Medical Equipment Co Ltd 63 Figure 56...