![Daikin RZQG71L9V1 Service Manual Download Page 62](http://html1.mh-extra.com/html/daikin/rzqg71l9v1/rzqg71l9v1_service-manual_4704641062.webp)
Function Details
ESIE15-13C
48
Function and Control
3.2.25 Defrost Operation
When in heating mode, a defrost operation will be conducted in order to avoid ice formation on
the outdoor unit heat exchanger.
Starting Conditions
Defrost will start when the following conditions have been realized:
Defrost conditions
Defrost upper limit A
Depending on the defrost start setting (field setting mode of the indoor unit remote controller),
frost upper limit time A becomes as shown in the table below.
&
• Integrated compressor running time is 25 minutes or more since the completion of the
previous defrost operation.
OR
• Defrost upper limit time A is met.
• Outdoor unit heat exchanger temperature is within the defrost request area.
When quick
defrost starting is
set
Factory setting
When slow defrost
starting is set
Outdoor air temperature > -5°C
40 minutes
2 hours
6 hours
Outdoor air temperature
≤
-5°C
40 minutes
6 hours
8 hours
-20
-15
-10
5
0
-3
-5
-6
-10
-7
-15
-20
-23
-17
-10
-7
-4
-7
-5
-5
-8
-13
-16
-19
-21
-12
-9
-6
-24
-27
-28
-14
-11
-8
-8
-2
-25
-30
15
5
2
-1
-4
-1
-11
10
Outdoor unit heat exchanger temperature (°C)
Defrost permit
area
Defrost request
When slightly quick defrost starting is set (Permit)
Outdoor temperature (°C)
Factory setting (Permit)
When slightly quick defrost starting is set (Request)
When slightly slow defrost starting is set (Permit)
Factory setting (Request)
When slightly slow defrost starting is set (Request)
Summary of Contents for RZQG71L9V1
Page 2: ......
Page 6: ...ESIE15 13C iv Table of Contents...
Page 14: ...Introduction ESIE15 13C xii...
Page 18: ...Outlook Outdoor Units ESIE15 13C 4 General Information 2 Outlook Outdoor Units...
Page 22: ...Operating range ESIE15 13C 8 General Information...
Page 108: ...Emergency Operation ESIE15 13C 94 Field Setting...