SiUS39-601
Test Operation
Test Operation
65
1.1.3
Check Operation
* During check operation, mount front panel to avoid the misjudging.
* Check operation is mandatory for normal unit operation.
(When the check operation is not executed, alarm code "U3" will be displayed.)
On completion of test operation, LED on outdoor unit PC board displays the following.
H3P ON: Normal completion
H2P and H3P ON: Abnormal completion
→
Check the indoor unit remote controller for
abnormal display and correct it.
In the case of multi-outdoor-unit system, make setting on the master unit PC board. (Setting with
the slave unit is disabled.)
[LED display in the case of multi-outdoor-unit system] (Same as that in emergency operation)
* Discriminate the operating status of the master unit/slave units through the following LED
display.
LED display (
7
:ON
7
7
:OFF
9
9
:Blink)
H1P---H7P H8P
(Factory set)
Master:
Slave :
77
7777777
7777 7
7777777
7777777 9
9
Summary of Contents for RXYQ72
Page 115: ...Field Setting SiUS39 601 104 Test Operation...
Page 227: ...Troubleshooting OP Unified ON OFF Controller SiUS39 601 216 Troubleshooting...
Page 231: ...Piping Diagrams SiUS39 601 220 Appendix 1 Piping Diagrams 1 1 Outdoor Unit RXYQ72M 96M...
Page 236: ...SiUS39 601 Wiring Diagrams for Reference Appendix 225 RXYQ144 168 192MTJU C 3D050353A...
Page 249: ...Example of Connection SiUS39 601 238 Appendix...
Page 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 601 244 Appendix...
Page 265: ...Precautions for New Refrigerant R 410A SiUS39 601 254 Precautions for New Refrigerant R 410A...
Page 269: ...SiUS39 601 iv Index...