![background image](http://html1.mh-extra.com/html/daikin/rxq25amv1b/rxq25amv1b_service-manual_4205016099.webp)
3
|
Components
Service manual
99
RXQ25+3 3 3
35AMV1B
Split Sensira R32 BBOP
ESIE21-16 – 2022.02
f
a
d
c
b
e
a
Electrical power supply wiring
b
Wire terminals
c
Screws
d
Wire clamp
e
Screws
f
Right side plate assembly
3
Connect the electrical power supply wiring to the wire terminals.
4
Install the wire clamp and fix it using the screws.
5
Connect all connectors to the main PCB.
INFORMATION
Use the wiring diagram and connection diagram for correct installation of the
connectors, see
WARNING
When reconnecting a connector to the PCB, make sure to connect it on the correct
location and do NOT apply force, as this may damage the connector or connector
pins of the PCB.
6
Fix the wiring to the switch box using a new cable tie.