![background image](http://html1.mh-extra.com/html/daikin/rxq25amv1b/rxq25amv1b_service-manual_4205016053.webp)
3
|
Components
Service manual
53
RXQ25+3 3 3
35AMV1B
Split Sensira R32 BBOP
ESIE21-16 – 2022.02
a
a
Compressor wire terminals cover
3
Disconnect the Faston connectors from the compressor wire terminals U, V
and W.
INFORMATION
Note the position of the Faston connectors on the compressor wire terminals to
allow correct connection during installation.
V
U
W
U
Wire terminal U
V
Wire terminal V
W
Wire terminal W
CAUTION
Before measuring the compressor motor windings resistance, measure the
resistance of the multimeter probes by holding the probes against each other. If the
measured resistance is NOT 0 Ώ, this value MUST be subtracted from the measured
winding resistance.
4
Measure the resistance between the compressor motor windings U-V, V-W
and U-W.
Result:
All measurements MUST be approximately the same.