![background image](http://html1.mh-extra.com/html/daikin/rxq25amv1b/rxq25amv1b_service-manual_4205016100.webp)
3
|
Components
Service manual
100
RXQ25+3 3 3
35AMV1B
Split Sensira R32 BBOP
ESIE21-16 – 2022.02
a
b
a
Cable tie
b
Switch box
7
Install the insulation on the upper side of the switch box.
a
b
a
Insulation
b
Main PCB
3.10.2 Indoor unit
To open the front panel
1
Hold the front panel by the panel tabs on both sides and open it.
To close the front panel
1
Set the filters as they were.
2
Gently press the front panel at both sides and at the center until it clicks.