Components
Service manual
57
RXQ25+3 3 3
35AMV1B
Split Sensira R32 BBOP
ESIE21-16 – 2022.02
a
a
Compressor wire terminals cover
3
Disconnect the Faston connectors from the compressor wire terminals U, V
and W.
INFORMATION
Note the position of the Faston connectors on the compressor wire terminals to
allow correct connection during installation.
V
U
W
U
Wire terminal U
V
Wire terminal V
W
Wire terminal W
4
Remove the compressor thermal protector, see
62].
5
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
6
Wrap a wet rag around the components near the compressor pipes. Heat the
brazing points of the compressor pipes using an oxygen acetylene torch and
remove the refrigerant pipes from the compressor pipes using pliers.