Test Operation
SiBE811001EB
47
CONVENI-PACK
Verify that all power is shut down.
Conduct evacuation from the service ports of stop valves
���
,
���
and
���
of the outdoor unit.
Evacuation should be conducted over approximately 1 hour, confirming the vacuum is sucking. (Under -0.1 MPa)
Open a hole in the can of oil, then insert the piping to the bottom of the can. Quickly close any air gaps around the
piping with the waste cloth ensuring the oil is not exposed to the air. (Refer to diagram on previous page) - The hole
you make in the can should be large enough that you can visually confirm that the amount of oil is depleting.
Watching as the oil is emptied from the can, once the weighing scales indicate the oil has depleted by 0.94 kg (1.0
liters), remove the adaptor from the service port. – Standard time taken for 1 liter of oil to be filled: approximately 20
minutes in the summer.
Resume evacuation.
Open all stop valves in the outdoor unit.
<In case of the outdoor unit is placed above>
(1) Confirm the liquid piping capacity is greater than the volume of refrigeration oil to be charged.
(2) Evacuate from the liquid stop valve on the refrigeration side of the outdoor unit.
(3) Charge oil from the liquid stop valve of the booster unit.
<In case of the outdoor unit is placed below>
(1) Confirm the liquid piping capacity is greater than the volume of refrigeration oil to be charged.
(2) Evacuate from the liquid stop valve of the booster unit.
(3) Charge oil from the refrigeration side liquid stop valve of the outdoor unit.
∗
Charge oil by utilizing the above methods or a charging shilling.
Piping size
φ
6.4
0.018
φ
9.5
0.049
φ
12.7
0.093
φ
15.9
0.165
Refrigeration
oil
Air-conditioner
Vacuum pump
Outdoor unit
Insert all the way to the bottom
Weighing scales
Air conditioning Refrigeration
Freezer showcase
Booster unit
Cover any gaps
using the waste cloth
Solenoid
valve ON
Piping capacity
per 1 m (L/m)
Liquid
(open)
Gas
(open)
Liquid
(closed)
Liquid
(closed)
Gas
(closed)
Gas
(closed)
φ
6.4
0.018
φ
9.5
0.049
φ
12.7
0.093
φ
15.9
0.165
Piping size
Refrigeration oil
Piping capacity
per 1 m (L/m)
Outdoor unit
Air conditioning Refrigeration
Solenoid valve ON
Booster unit
Vacuum pump
Liquid
(closed)
Liquid
(closed)
Gas
(closed)
Gas
(closed)
Weighing
scales
Insert all the way
to the bottom
Cover any gaps
using the waste cloth
Freezer
showcase
Liquid
(open)
Gas
(open)
Air-
conditioner