7
|
Unit installation
Installer reference guide
79
ERGA04~V3A+V37 + EHSH/X(B)04+08P30+50EF
Daikin Altherma 3 R ECH₂O
4P678716-1A – 2022.07
1×
7.2.5 To lower the switch box of the indoor unit and remove the top cover
During the installation, you will need access to the inside of the indoor unit. To
have easier front access, lower the switch box of the unit as follows:
Prerequisite:
The user interface panel has been removed.
1
Loosen the screws.
2
Lift up the switch box.
2×
2
1
3
Lower the switch box.