9
|
Electrical installation
Installer reference guide
120
ERGA04~V3A+V37 + EHSH/X(B)04+08P30+50EF
Daikin Altherma 3 R ECH₂O
4P678716-1A – 2022.07
1 2 3
L
N
L N PWR
12 3
3×
a
a
Wire clamp
5
Reattach the switch box cover.
6
Reattach the refrigerant piping cover. Make sure the cables are routed under
the cover as shown:
7
Connect an earth leakage circuit breaker and fuse to the power supply line.
9.3 Connections to the indoor unit
Item
Description
Power supply (main)
"9.3.2 To connect the main power
125].
Power supply (backup
heater)
"9.3.3 To connect the backup heater power
127].
Backup heater
"9.3.4 To connect the backup heater to the main
Shut-off valve
"9.3.5 To connect the shut-off valve"
Electricity meters
"9.3.6 To connect the electricity meters"
Domestic hot water pump
"9.3.7 To connect the domestic hot water
133].
Alarm output
"9.3.8 To connect the alarm output"
134].
Space cooling/heating
operation control
"9.3.9 To connect the space cooling/heating ON/
135].