S0703010K
Page 4
Accumulator
NOTE:
Pre-charge pressure is referred to as the "P1" pressure. The accumulator manufacturer’s
"P1" rated pressure should be stamped or marked on the accumulator’s rating plate.
Annual checks of actual pre-charge pressure should be made by tapping a hydraulic
pressure gauge (and 3-way adapter coupling) into the valve on the bottom of the
accumulator. When hydraulic fluid is pushed out the lower valve opening by the pressure
of the gas charge on the other side of the diaphragm - and there is no counter-pressure
from system oil - the valve button on the bottom of the diaphragm eventually seals off the
lower oil passage. Just after the needle on the gauge reaches its highest point (when there
is 0 bar (0 psi) resistance from hydraulic system pressure) pressure on the gauge will drop
sharply to zero, as the accumulator is completely emptied of oil and the diaphragm button
closes.
Record the highest gauge reading and compare to the "P1" rated pre-charge pressure on the
accumulator manufacturer’s data label. Repeat this test at least once a year to verify proper
functioning of the accumulator.
3.
As hydraulic system pressure overcomes accumulator pre-charge pressure, the flexible diaphragm
begins to retract upward.
4.
When system oil is at highest working pressure and the accumulator fills to maximum reserve
capacity, the flexible diaphragm is pushed up into the top of the upper chamber.
The highest working pressure is sometimes referred to as the "P3" pressure and can also be
referenced on the manufacturer’s data label on the exterior of the accumulator.
5.
If system oil pressure begins to fall off or is momentarily checked or interrupted, the energy stored on
the other side of the diaphragm, in the form of compressed gas, pushes oil back out of the lower
chamber, maintaining oil pressure of the circuit.
6.
With minimal system pressure, an equilibrium point may be reached in which accumulator pre-charge
pressure and hydraulic system oil pressure achieve a rough balance. In this condition a minimal
amount of oil is stored in the accumulator.
SPECIFICATIONS
Model
Serial Number
System
Charge
Pressure
Volume
Solar 300LC-V
S/N 1001 thru 1099
Pilot / Travel
10 kg/cm
2
(140 psi)
320 cc
(19.53 in
3
)
S/N 1100 and Up
750 cc
(45.77 in
3
)
Solar 300LL
S/N 1100 and Up
Pilot / Travel
10 kg/cm
2
(140 psi)
750 cc
(45.77 in
3
)
Solar 340LC-V
S/N 1001 thru 1059
Pilot / Travel
10 kg/cm
2
(140 psi)
320 cc
(19.53 in
3
)
S/N 1060 and Up
750 cc
(45.77 in
3
)
Solar 420LC-V
S/N 1001 thru 1029
Pilot / Travel
10 kg/cm
2
(140 psi)
320 cc
(19.53 in
3
)
S/N 1030 and Up
750 cc
(45.77 in
3
)
Summary of Contents for Solar 300LC-V
Page 2: ......
Page 4: ......
Page 7: ...1SAFETY...
Page 8: ......
Page 46: ...S0102000 Page 38 Track Excavator Safety...
Page 47: ...1SPECIFICATIONS...
Page 48: ......
Page 54: ...S0202080K Page 6 Specifications for Solar 300LC V...
Page 70: ...S0202080K Page 22 Specifications for Solar 300LC V...
Page 71: ...1GENERAL MAINTENANCE...
Page 72: ......
Page 86: ...S0302000 Page 14 General Maintenance Procedures Return to Master Table of Contents...
Page 99: ...1UPPER STRUCTURE...
Page 100: ......
Page 102: ...S0402040K Page 2 Cab TABLE OF CONTENTS Removal 3 Installation 6...
Page 116: ...S0403050K Page 8 Counterweight Return to Master Table of Contents...
Page 140: ...S0407000 Page 6 Swing Bearing...
Page 164: ...S0408070K Page 24 Swing Reduction Gear...
Page 165: ...1LOWER STRUCTURE AND CHASSIS...
Page 166: ......
Page 190: ...S0505000 Page 24 Track Assembly 7 Tighten plug 1 Figure 48 Figure 48...
Page 191: ...S0505000 Page 25 Track Assembly TRACK SPRING AND TRACK ADJUSTING CYLINDER PARTS LIST Figure 49...
Page 193: ...1ENGINE AND DRIVE TRAIN...
Page 194: ......
Page 205: ...S0605060K Page 11 Air Conditioner Face and Defroster ARS1300L Figure 12...
Page 220: ...S0605060K Page 26 Air Conditioner...
Page 229: ...1HYDRAULICS...
Page 230: ......
Page 262: ...S0703010K Page 2 Accumulator TABLE OF CONTENTS General Description 3 Specifications 4...
Page 266: ...S0703010K Page 6 Accumulator...
Page 274: ...S0704080K Page 8 Center Joint Swivel...
Page 283: ...S0705000 Page 9 Cylinders...
Page 287: ...S0705000 Page 13 Cylinders...
Page 291: ...S0705000 Page 17 Cylinders...
Page 299: ...S0705000 Page 25 Cylinders...
Page 308: ...S0705000 Page 34 Cylinders 17 Force out pin bushing 1 from body of cylinder Figure 28...
Page 312: ...S0705000 Page 38 Cylinders...
Page 324: ...S0707270K Page 12 Swing Motor Toshiba MFC200 PARTS LIST Figure 6...
Page 355: ...S0707315K Page 11 Travel Motor with Gearbox...
Page 424: ...S0708315K Page 28 Main Pump Kawasaki CONSTRUCTION OF REGULATOR Figure 22...
Page 444: ...S0708315K Page 48 Main Pump Kawasaki...
Page 450: ...S0709401K Page 6 Main Control Valve Kayaba Figure 1...
Page 451: ...S0709401K Page 7 Main Control Valve Kayaba Figure 2...
Page 453: ...S0709401K Page 9 Main Control Valve Kayaba...
Page 455: ...S0709401K Page 11 Main Control Valve Kayaba Figure 4...
Page 467: ...S0709401K Page 23 Main Control Valve Kayaba Figure 16...
Page 500: ...S0709401K Page 56 Main Control Valve Kayaba Figure 54...
Page 552: ...S0792160K Page 6 Hydraulic Schematic S300LC V...
Page 553: ...1ELECTRICAL SYSTEM...
Page 554: ......
Page 608: ...S0802220K Page 54 Electrical System...
Page 627: ...S0802220K Page 73 Electrical System...
Page 634: ...S0892160K Page 4 Electrical Schematic S300LC V SOLAR 300LC V Figure 2...
Page 636: ...S0892160K Page 6 Electrical Schematic S300LC V...
Page 637: ...1ATTACHMENTS...
Page 638: ......
Page 658: ......