![D-Link RG-S8606 B Installation And Reference Manual Download Page 89](http://html.mh-extra.com/html/d-link/rg-s8606-b/rg-s8606-b_installation-and-reference-manual_78229089.webp)
Figure 3-31 Installing RG-PD1200 V2.10 or Later
Insulationg cover
Wiring terminals
Precautions
Before connecting the power supply, you must verify that the external power supply matches the power module
installed in this equipment.
Before connecting the power cable, be sure that the switch of the power module is in the OFF position.
The power cables of various colors must be connected to the appropriate wiring posts.
Be sure that the power cables connected are in good contact.
Simple Connection Steps
1) Remove the insulating cover of the DC wiring terminal.
2) Insert the power cable into the corresponding terminal based on the label and tighten the bolts.
3) Put on the insulating cover and tighten the bolts.
4) Connect the other end of the power cable to the corresponding socket or connector.
Connecting the AC Power Supply to the Power Module
Connect AC power cables according to the mark and position instruction on the RG-PA1200/PA1200E/
PA1200I/PA2000I/PA2000 panel (The PA800IF has no AC interface, the AC interface is at the back of the S8606 B
chassis.).
Summary of Contents for RG-S8606 B
Page 1: ...RG S8600 Series Switch Hardware Installation and Reference Guide V1 78 ...
Page 58: ...Figure 2 3 Moving the RG S8606 Switch Figure 2 4 Moving the RG S8606 B Switch ...
Page 62: ...Figure 2 6 Ventilation of RG S8614 ...
Page 63: ...Figure 2 7 Ventilation of RG S8610 Figure 2 8 Ventilation of RG S8606 ...
Page 76: ...Figure 3 8 Installing the Power Supply of the RG S8606 Switch ...
Page 92: ...Figure 3 34 Board Components of the RG S8610 Figure 3 35 Board Components of RG S8606 ...
Page 116: ......