4)
Install the tray and wiring layer on the rack according to the configuration of one rack with one cabinet installed or
one rack with multiple cabinets installed.
Guide Rails Installation
Before installing a guide rail, you need to have some knowledge of standard 19-inch cabinets of IEC60297. The height of
standard cabinets is measured in Rack Unit (RU, 1 RU = 44.45 mm (1.75 inch)). 1 RU is equal to the height of three holes
(see Figure 3-2). The hole in the middle is an auxiliary installation hole, and the other holes are standard installation holes.
Note that the space between neighboring standard installation holes is a little smaller than that between an auxiliary
installation hole and its neighboring standard installation hole. When installing a guide rail for the RG-S8600 series,
ensure that the plane to carry the chassis should be installed on the plane of delimiters (entire-U delimiter) of the two
neighboring RUs.
Figure 3-1 Guide Rail
Note:
and
representing entire-U delimiters
Before installing a guide rail, confirm that the weight capacity of the guide rail meets requirements.
RG-S8600 series switches have two models with different heights. Install the chassis in the cabinet according to the
actual situation.
Considering a variety of guide rails, guide rail appearance and installation methods depend on the actual situation.
The RG-S8600 series switches are heavy. To ensure cabinet stability: install the guide rail to as low a position as
possible in the cabinet if one RG-S8600 is installed; install heavier devices in the lower part of the cabinet if multiple
devices are installed.
It is recommended to install the power socket after planning on available space properly. Otherwise, there may be
problems for operation.
Mounting into the Cabinet
Precautions
Before mounting RG-S8614/S8610/S8606/S8606 B into the cabinet, first verify that the front and back brackets of the
cabinet are at the right locations. If the bracket is too far forward, the front panel of the equipment may be too close to the
front door, and the front door cannot be closed when network cables and pigtail fibers are connected. Usually, you should
reserve at least 10 mm between the front panel of the equipment and that of the cabinet after installation.
Before mounting into a cabinet, you need to do as follows:
Fix the cabinet.
Install modules in the frame properly.
Remove any obstacle in the cabinet and the surrounding environment.
Summary of Contents for RG-S8606 B
Page 1: ...RG S8600 Series Switch Hardware Installation and Reference Guide V1 78 ...
Page 58: ...Figure 2 3 Moving the RG S8606 Switch Figure 2 4 Moving the RG S8606 B Switch ...
Page 62: ...Figure 2 6 Ventilation of RG S8614 ...
Page 63: ...Figure 2 7 Ventilation of RG S8610 Figure 2 8 Ventilation of RG S8606 ...
Page 76: ...Figure 3 8 Installing the Power Supply of the RG S8606 Switch ...
Page 92: ...Figure 3 34 Board Components of the RG S8610 Figure 3 35 Board Components of RG S8606 ...