4)
Install the LCD: Align the DB-25 connector of the cable with the corresponding connector on the circuit board and
then insert it. Tighten the screws on the connector with a magnetic screwdriver. At this point, the LCD works if the
device works properly.
5)
Handle the LCD with your hands, align the buttons with the positioning holes on the chassis and put all buttons into
position to complete the installation of the LCD.
During the operation, it is necessary to wear the anti-static wrist strap. The metallic part of the anti-static wrist strap
should be in full contact with the skin. Besides, for the sake of security, do not touch any component on the LCD.
Summary of Contents for RG-S8606 B
Page 1: ...RG S8600 Series Switch Hardware Installation and Reference Guide V1 78 ...
Page 58: ...Figure 2 3 Moving the RG S8606 Switch Figure 2 4 Moving the RG S8606 B Switch ...
Page 62: ...Figure 2 6 Ventilation of RG S8614 ...
Page 63: ...Figure 2 7 Ventilation of RG S8610 Figure 2 8 Ventilation of RG S8606 ...
Page 76: ...Figure 3 8 Installing the Power Supply of the RG S8606 Switch ...
Page 92: ...Figure 3 34 Board Components of the RG S8610 Figure 3 35 Board Components of RG S8606 ...
Page 116: ......