
TABLE OF CONTENTS
CHAPTER 3
INSTALLATION
PREPARATION FOR USE .......................................................................................................................... 3-1
MAIN POWER CONNECTION .................................................................................................................... 3-3
VOLTAGE CHANGE ON ZP CHAMBERS ................................................................................................. 3-4
REFRIGERATION SYSTEM PRESSURES ................................................................................................ 3-4
WATER COOLED UNITS (OPTIONAL EQUIPMENT) .............................................................................. 3-4
SCROLL COMPRESSORS ONLY .............................................................................................................. 3-6
HUMIDITY SYSTEM (OPTIONAL EQUIPMENT) ...................................................................................... 3-6
FIGURES AND TABLES
FIGURE 1. TRANSPORTING A CHAMBER ................................................................................................................ 3-2
FIGURE 2. INSTALLATION LOCATIONS .................................................................................................................... 3-7
TABLE 1. WATER USAGE TABLE (ENGLISH UNITS) ................................................................................................ 3-5
TABLE 1. WATER USAGE TABLE (SI UNITS)............................................................................................................. 3-6
CHAPTER 4
OPERATING INSTRUCTIONS
START-UP INSTRUCTIONS SUMMARY (EZT-570S CONTROLLER) ...................................................... 4-1
PUMPDOWN ............................................................................................................................................... 4-2
SINGLE SET POINT OPERATION ............................................................................................................. 4-3
MANUAL EVENT CONTROL ..................................................................................................................... 4-4
PROFILE OPERATION ............................................................................................................................... 4-4
START-UP INSTRUCTION SUMMARY (WATLOW F4 CONTROLLER) (OPTIONAL EQUIPMENT) ....... 4-5
SUMMARY FOR STEP-BY-STEP SET-POINT OPERATION .................................................................... 4-5
WATLOW F4 CONTROLLER OUTPUTS ................................................................................................... 4-6
DRY AIR PURGE (OPTIONAL EQUIPMENT) ............................................................................................ 4-8
IEEE 488 - F4 CONTROLLER (OPTIONAL EQUIPMENT) ........................................................................ 4-9
HIGH/LOW LIMIT CONTROL (OPTIONAL EQUIPMENT) ....................................................................... 4-10
PROGRAMMABLE DOOR LOCK (OPTIONAL EQUIPMENT) ................................................................ 4-10
VAISALA HMT337 HUMIDITY AND TEMPERATURE TRANSMITTER (OPTIONAL EQUIPMENT) ...... 4-10
START-UP INSTRUCTIONS SUMMARY - REMOTE SENSOR (OPTIONAL EQUIPMENT) .................. 4-11
AIR SUPPLY DAMPER ............................................................................................................................. 4-12
ATTACHING GLOVES .............................................................................................................................. 4-13
FIGURES AND TABLES
FIGURE 1. CSZ EZT-570S CONTROLLER ................................................................................................................. 4-1
FIGURE 2. WATLOW F4 CONTROLLER OUTPUTS .................................................................................................. 4-7
FIGURE 3. DRY AIR PURGE COMPONENTS LOCATION ......................................................................................... 4-8
FIGURE 4. CONTROLLER PANEL ............................................................................................................................ 4-11
FIGURE 5. AIR SUPPLY DAMPER ............................................................................................................................ 4-12
Summary of Contents for ZP 16
Page 1: ...Installation Operation Maintenance Manual ZP Series 56120 REV AH 10 2019...
Page 4: ...INTRODUCTION THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ...CHAMBER LABELS MEANINGS THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...GENERAL DESCRIPTION Page 2 24 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...INSTALLATION Page 3 2 Figure 1 Transporting a Chamber...
Page 46: ...INSTALLATION Page 3 6 Table 2 Water Usage SI Units...
Page 62: ...OPERATION Page 4 14 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 82: ...MAINTENANCE WITH Q A Page 5 20 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...SERVICE PARTS WARRANTY Page 6 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...SYSTEM DIAGRAMS Page 9 4 THIS PAGE INTENTIONALLY LEFT BLANK...