INSTALLATION
Page 3-8
Figure 2. Installation Locations
R-508B
Compressor
System #2
R-404A
Compressor
System #1
Pressure
Gauges
Upper Refrigeration
Components located
behind access panel
Water Inlet
Location
Electrical Connection
LN2 Boost Valves
(Optional)
LN2 Vent
(Must be vented outdoors)
Dry Air Purge
(Optional)
Steam Generator
Assembly
Float Switch
Enclosure
Float Switch
Drain Valve
Pump
Recirculating Water
(Optional with Humidity)
Demineralizer Filter
(Optional with Humidity)
Water Cooled Condenser
Connections (If Applicable)
Note: CSZ is continuously upgrading the components used
in its equipment. Consequently, the physical appearance of
certain components may vary from that shown.
Summary of Contents for ZP 16
Page 1: ...Installation Operation Maintenance Manual ZP Series 56120 REV AH 10 2019...
Page 4: ...INTRODUCTION THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ...CHAMBER LABELS MEANINGS THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...GENERAL DESCRIPTION Page 2 24 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...INSTALLATION Page 3 2 Figure 1 Transporting a Chamber...
Page 46: ...INSTALLATION Page 3 6 Table 2 Water Usage SI Units...
Page 62: ...OPERATION Page 4 14 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 82: ...MAINTENANCE WITH Q A Page 5 20 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...SERVICE PARTS WARRANTY Page 6 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...SYSTEM DIAGRAMS Page 9 4 THIS PAGE INTENTIONALLY LEFT BLANK...