4
Table of Contents
I. Pre-Installation .............................................................
6
II. Boiler Assembly ...........................................................
8
III. Gas Control System Assembly ..................................
15
IV. Water Trim and Piping ...............................................
19
V. Gas Piping ..................................................................
23
VI. Venting .......................................................................
25
VII. Electrical ....................................................................
28
VIII. System Start-up ..........................................................
36
IX. Service & Troubleshooting ........................................
42
X. Repair Parts ................................................................
49
Summary of Contents for 16H-340
Page 13: ...13 Figure 8 Jacket Assembly ...
Page 14: ...14 Figure 9 EP CSD 1 Control Installation ...
Page 16: ...16 Figure 11 Main Gas Piping Intermittent Ignition EI ...
Page 17: ...17 Figure 12 Schematic Pilot Piping Honeywell EI USA ...
Page 18: ...18 Figure 15 Schematic Gas Piping EP CSD 1 Control System 16H 410 16H 505 ...
Page 37: ...37 Figure 41 Operating Instructions EI ...
Page 47: ...47 Honeywell EI Trouble Shooting Guide ...
Page 48: ...48 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 58: ...58 ...
Page 60: ...60 ...