34
Peristaltic Pumps Series IP 100-800
10
20
30
40
50
5.10
Pump conversion for different
pumping pressure
Fig. 44
Each peristaltic pump is adjusted to the desired
pumping pressure in the factory. Should an
application related change in pumping pressure
become necessary, the desired pumping
pressure can be adjusted by changing the rotor
diameter (Fig. 44).
Perform this process with utmost
attention. In case of a failure
switch off the pump immediately.
Switch the pump on again for a short
moment, so that the end of the hose on the
suction side is pulled to the correct
installation position.
5. Assemble the connecting socket on the
suction side.
Assemble the connecting socket as described
under point 4.
First insert the ventilation pipe (suction side)
into the small hose bore and lay it into the
groove in the retaining ring (narrow) (Fig.
35). Insert the other end into the angle fitting
and fasten it with the spigot nut.
6. Replace the oil drain plug, fill with lubricating
fluid (see chapter Technical Data) for proper
amount.
7. Replace fill plug (do not forget the seal ring).
5.9
Conversion suction side “top” to
suction side “bottom”
The vacuum system needs to be changed for
this purpose.
1. Switch off the pump and secure it against
restarting.
2. Disconnect the pump from the pipeline
system on suction and pressure side (see
chapter 5.8.1)
3. The ventilation pipe on suction side is
replaced with a different version and
connected with the angle fitting on the back
of the pump. The ventilation pipe on
pressure side is guided to the outside (Fig.
43).
4. Connect suction and pressure lines
according to the new configuration.
Attention!
Fig. 43
Summary of Contents for ELRO IP 100
Page 4: ...4 ...