22
Peristaltic Pumps Series IP 100-800
Perform this process with utmost
attention. In case of a failure
switch off the pump immediately.
9. Switch off the pump! Remove pump cover
and O-ring again and inspect the inside of
the housing.
5.2.2 Inspecting the inside of the pump
1. Before installing a new pumping hose clean
the inside of the pump housing and check for
damage.
2. Replace damaged parts.
5.2.3 Installing the new pumping hose
1. Attach the pump cover with a new O-ring
and tighten the nuts.
2. Slightly lubricate one end of the pumping
hose with sliding fluid and push it into the
suction port, until the hose stops.
3. Switch the pump on for a moment. Keep
pushing the hose so that the rotor can pull the
pumping hose step by step into the pump
housing. Once the pumping hose has reached
the opening on the pressure side of the pump
housing switch off the pump and guide the
pumping hose with a round steel bar through
the opening in the pump housing (do not use
any tools with sharp edges) Switch the
pump on again for a short moment, so that
the correct installation position can be
reached.
Fig. 18
Pumping hoses are delivered in correct
installation lengths. The correct installation
position is reached when the hose section
X
X
8. Switch the pump on for a moment, so that
the pumping hose is completely forced out of
the housing. Assist this process by pulling
the pumping hose out of the pump housing.
Fig. 16
Please ensure that the small bore in the hose is
located opposite the rotor (outside)
(Fig. 17).
Fig. 17
Attention!
Summary of Contents for ELRO IP 100
Page 4: ...4 ...