27
Peristaltic Pumps Series IP 100-800
X
Fig. 25
2. Slightly lubricate one end of the pumping
hose with lubricating fluid and push it into the
suction port of the pump (Fig. 25), until the
hose stops.
Fig. 26
Make sure that the small hose bore is at the
inside, near the rotor (Fig. 26).
3. Switch the pump on for a short moment, so
that the rotor can pull the pumping hose step
by step into the pump housing, keep pushing
on the hose to assist.
4. Once the pumping hose has reached the
opening on the pressure side of the pump
housing switch the pump off and centre the
hose with a round steel bar to guide it
through the opening in the housing.
Do not use any tools with sharp edges.
5. Switch the pump on again for a short
moment, so that the correct installation
position can be reached.
Fig. 27
The pumping hose is delivered in correct
installation length. The correct installation
position is reached when the length the hose
protrudes from the housing (Fig. 27) matches
the the non-threaded section (X) of the studs.
The vacuum bores in the hose must be
exactly in line. The hose must not be twisted
during installation.
Summary of Contents for ELRO IP 100
Page 4: ...4 ...