CABRIOLE’
CRAMARO TS S.r.l. – 37044 COLOGNA V.TA (VR) - VIA QUARI DESTRA, 71/G TEL. +39 0442/411688 / FAX + 39 0442/411690
E-MAIL [email protected] WEBSITE: http://www.cramaro.com -
Manual n° MCA016-EN-ED00 – date 15/01/15
page
45
FIG 71-3
40
FIG 71-2
FIG 4
tension them slightly using the specific
tie rods located in the FRONT or REAR
At this point, bring the tarpaulin up to the stopping point
on the front inclined bracket so that
all the bows are perfectly aligned.
Holding the front part of the tarpaulin still,
extend it, activating the movement with caution, until the LAST BOW is about 40mm from the rear stopping point
40
FIG 3
(
ATTENTION: IT IS ESSENTIAL FOR THE
DISTANCE TO BE THE SAME ON BOTH SIDES
)
Two equal SPACERS could be used,
positioned between the last bow and the last stopping point.
At this point, gripping the FRONT side sections
of the sheet and pulling them towards the front edge
of the cab-shield (front of the container),
SECURE the PEHD STRIP to the front inclined bracket
on both sides of the tarpaulin
Once the PEHD STRIP is secured to the front brackets,
gently pull the front part of the sheet
until it rests on the front edge of the cab-shield,
then position the pre-drilled strip on the front edge
of the cab-shield and make holes, using the pre-drilled strip
as a template.
Once the holes have been made on the cab-shield, pull the front part of the sheet