![Conductix-Wampfler SingleFlexLine Program 0815 Operating Instructions Manual Download Page 75](http://html1.mh-extra.com/html/conductix-wampfler/singleflexline-program-0815/singleflexline-program-0815_operating-instructions-manual_2651969075.webp)
Operating Instructions
Single-pole Conductor Rail System
SingleFlexLine Program 0815
BAL0815-0002g-US
www.conductix.us
translated document
page 75 of 128
→
Do not remove the setting aids from the expansion module until the following fixed point (see also BAL0815-0002) has been
mounted. Check whether the dimension of every expansion gap is 20 mm (see Fig. 90).
Fig. 90: The expansion gap is 20 mm
Use the QR code (“click” or “scan”) to watch our animation
Expansion Module with 20 mm Expansion Gap
.