Installation
SMS-7000 Modem Protection Switch
2–8
Rev. 3
2.3.2 Installation
2.3.2.1
Switch Control Unit
The Switch Control Unit (SCU) arrives fully assembled from the factory. After
unpacking the switch, install the switch control unit into the equipment rack and secure
with customer-furnished hardware.
2.3.2.2
Top Mount Installation
The Top Mount Hardware Kit (KT/5275) is for fixed-mounting the Data Switch Unit
(DSU) and Intermediate Frequency Switch Unit (IFU) to a standard equipment rack rails.
Kit components are listed in Section 2.2.
Although top mounting can be employed wherever there is clearance within the rack, it
provides a convenient external rack interface for both terrestrial data and IF signals that
are routed from the ceiling.
Assemble the DSU and IFU as shown in Figure 2-1 and as follows:
1.
Install Bracket (FP/5272) on the IFU and secure with 6 screws and flat washers.
2.
Install Bracket (FP/5273) onto the DSU and secure with 8 screws and flat
washers.
3.
Position unit into the rack and secure with customer-furnished hardware.
Summary of Contents for SMS-7000
Page 2: ......
Page 6: ......
Page 8: ......
Page 34: ...Introduction SMS 7000 Modem Protection Switch 1 14 Rev 3 This page is intentionally left blank...
Page 43: ...SMS 7000 Modem Protection Switch Installation Rev 3 2 9 Figure 2 1 Top Mount Installation...
Page 70: ...Installation SMS 7000 Modem Protection Switch 2 36 Rev 3 This page is intentionally left blank...
Page 76: ...Operation SMS 7000 Modem Protection Switch 3 6 Rev 3 This page is intentionally left blank...
Page 83: ...SMS 7000 Modem Protection Switch Operation Rev 3 3 13 This page is intentionally left blank...
Page 104: ...Operation SMS 7000 Modem Protection Switch 3 34 Rev 3 This page is intentionally left blank...
Page 148: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...