4.  When assembling the latch to the hook, the end of the rivet 

must be peened over. When peening over the rivet, only apply 

enough force to form the head and retain the rivet. Excessive 

force will deform the latch and make the latch inoperable.

REEVING LOAD CHAIN

A. 1/2, 1, 2 (SINGLE REEVE) TON HOISTS

Attach approximately 20”(508mm) of soft wire to the loose end of the 

chain. Pass the wire over the top of the liftwheel and down between 

the liftwheel and the chain guide. Position the chain so that the first, 

as well as the third, link stands on edge with the weld away from the 

liftwheel and the second link lays flat on the liftwheel. After the chain 

has been started, pull hand chain in the hoisting direction until about 

2 feet (0.6M) of chain has passed over the liftwheel. The wire should 

now be removed from the chain. Remove the cotter pin from the 

loose end pin and slide the loose end pin to the side into the gear 

housing, leaving approximately 1/2”(12.7mm) of the pin protruding 

from the geared side plate. Loop the chain, making sure there are no 

twists, up to the loose end pin and slide the pin through the last link 

of the chain. Slide the loose end pin into hole in the handwheel side 

plate until the cotter pin hole is visible. Secure the loose end pin by 

reinstalling the cotter pin and spreading the legs of the cotter pin.

CHAIN GUIDE

LOOSE END PIN

LIFTWHEEL 

 

Failure to properly install the load chain between chain guide and 

liftwheel may cause the chain to lift out of the liftwheel pockets and 

allow the load to drop.

TO AVOID INJURY:

Feed load chain between liftwheel and chain guide, as shown above, 

before attaching it to the loose end pin..

B. 2 (DOUBLE-REEVE), 3 AND 5 TON

The load chain must have an odd number of links. After attaching 

the chain to the loose end pin per above, operate in the hoisting 

direction until the load end of the chain is approximately 5 feet  

(1.5M ) long. Run chain thru the hook block (first link around the 

sheave must stand on edge) and up to the dead end block.  

Secure chain to dead end block using the stud, nut and cotter  

pin. Refer to illustration below.

On the 3 and 5 ton units, twisted load chain will cause the chain to 

jam in the liftwheel or sheave wheels and this may break the chain 

and allow the load to drop.

TO AVOID INJURY:

Check each stage of reeving the chain to be sure it has no twists.

REEVING 

3 AND 5-TON HOIST

DEAD END 

BLOCK

LOOSE  

END PIN

EXTERIOR FINISH

The exterior surfaces of the hoists have a durable, scratch resistant 

finish. Normally, the exterior surfaces can be cleaned by wiping with 

a cloth. However, if the finish is damaged, compatible touch-up 

paint can be purchased from CM. Order one case (12-12 oz.-354mL 

aerosol cans) of orange touch-up paint Part Number 84190. Touch-

up paint is only available in case quantities. See below for ordering 

information.

PREVENTIVE MAINTENANCE

In addition to the periodic inspection procedure, a preventive 

maintenance program should be established to prolong the useful 

life of the hoist and maintain its dependability and continued 

safe use. The program should include the periodic inspections 

with particular attention being paid to the lubrication of various 

components using the recommended lubricants.

TESTING

Before using, all altered, repaired or used hoists that have not been 

operated for the previous 12 months should be tested by the user for 

proper operation. First, test the unit without a load and then with a 

light load of 50 pounds (23Kg.) times the number of load supporting 

chains to be sure that the hoist operates properly and that the brake 

holds the load when the hand chain is released. Next test with a 

load of 125% of rated capacity. In addition, hoists in which load 

sustaining parts have been replaced should be tested with 125% of 

rated capacity by or under the direction of an appointed person and 

written report prepared for record purposes. 

NOTE: For additional information on inspection and testing, refer 

to Code B30.16 “Overhead Hoists” obtainable from ASME Order 

Department, 22 Law

Summary of Contents for 2208A

Page 1: ...1 2 3 Y 5 TONNE 500 1000 2000 3000 Y 5000 KG Siga todas las instrucciones y advertencias para inspeccionar mantener y operar ste polipasto El uso de cualquier polipasto presenta algunos riesgos de da...

Page 2: ...to y centros de servicio situados estrat gicamente en Estados Unidos y Canad Estas instalaciones se han seleccionado en base a su capacidad demostrada en la reparaci n de equipos y suminstro de piezas...

Page 3: ...ted load 27 Report malfunctions or unusual performances of a hoist after it has been shut down until repaired 28 NOT operate a hoist on which the safety placards or decals are missing or illegible 29...

Page 4: ...Columbus McKinnon Corporation cannot be responsible for applications other than those for which CM equipment is recommended 1 chain fall SPECIFICATIONS Product Code Rated Capacity tons Standard Lift f...

Page 5: ...hoist frame for dents or cracks and inspect the load chain for nicks and gouges If shipping damage has occurred refer to the packing list envelope on the carton for claim procedure Operating a unit wi...

Page 6: ...of inspection must be determined by the individual application and are based upon the type of service to which the hoist will be subjected The inspection of hoists is divided into two general classif...

Page 7: ...11 11 33 287 9 3 3000 0 315 8 11 11 33 287 9 5 5000 0 394 10 11 14 17 359 9 Hand Chain 0 198 5 11 11 55 293 3 Note that worn chain can be an indication of worn hoist components For this reason the hoi...

Page 8: ...can 28619 1 gal 3 8L can DISASSEMBLY Two points of caution to be observed in disassembly are 1 Loose rollers and bearing balls are used in various locations in the units Care must be taken so as to n...

Page 9: ...feet 1 5M long Run chain thru the hook block first link around the sheave must stand on edge and up to the dead end block Secure chain to dead end block using the stud nut and cotter pin Refer to ill...

Page 10: ...When ordering replacement parts it is recommended that consideration be given to the need for also ordering such items as gaskets fasteners insulators etc These items may be damaged or lost during di...

Page 11: ...15 1 Loose End Pin includes 2 Cotter Pins 22921A 22805A 22927A 22523A 622A 16 1 Chain Guide Roller 22922A 22806A 22827A 22524A 622A 17 1 Upper Hook Assembly includes Hook with Latch Hook Block Bearing...

Page 12: ...10 Manual P N 192052171 Rev AA May 2018 ENGLISH ENGLISH SERIES 622A HAND HOIST EXPLODED VIEW NOTE Metric Tools Required for Fasteners...

Page 13: ......

Page 14: ...uya acci n de sujeci n NO sea segura se debe eliminar la holgura cuidadosamente 26 NO se debe utilizar el polipasto hasta que todas las personas est n alejadas de la carga 27 Si el polipasto presenta...

Page 15: ...e equipos que cumplan con los c digos de seguridad estatales y nacionales Columbus McKinnon Corporation no puede hacerse responsable de los usos distintos a aquellos para los que se recomienda el equi...

Page 16: ...embalaje que se encuentra en la caja para obtener informaci n acerca del procedimiento de reclamos ADVERTENCIA Si se pone en funcionamiento una unidad con da os externos evidentes la carga podr a cae...

Page 17: ...ue est haciendo y utilice el sentido com n No utilice el polipasto si est cansado distra do o bajo la influencia de drogas alcohol o medicamentos que reduzcan el control MANTENIMIENTO INSPECCI N Para...

Page 18: ...ena y realice una inspecci n eslab n por eslab n para verificar que no presenten cortes perforaciones torsi n desgaste o tensi n excesivos Se debe calibrar la cadena en toda su extensi n y se debe ree...

Page 19: ...Corning Corp o una equivalente las roscas de la manivela los engranajes los rodillos de la rueda de elevaci n los rodillos del rodamiento del engranaje los mu ones de la gu a de la cadena y el pasado...

Page 20: ...elevaci n hasta que aproximadamente 2 pies 0 6 mm de cadena hayan pasado por la rueda de elevaci n En este momento se debe retirar el alambre de la cadena Retire el pasador de chaveta del pasador de...

Page 21: ...el C digo B30 16 Polipastos elevados de la Sociedad Americana de Ingenieros Mec nicos American Society of Mechanical Engineers ASME que se puede obtener de ASME Order Department 22 Law Drive Box 2300...

Page 22: ...1 Pasador de extremo suelto incluye 2 pasadores de chaveta 22921A 22805A 22927A 22523A 622A 16 1 Rodillo de gu a de la cadena 22922A 22806A 22827A 22524A 622A 17 1 Conjunto del gancho superior incluye...

Page 23: ...polipasto y el kit del extremo muerto no hay piezas individuales disponibles para reparaciones Conjunto del bloque del gancho inferior A excepci n del pestillo del gancho no hay piezas individuales di...

Page 24: ...PAS Signaler les dysfonctionnements ou les performances nhabituelles d un palan apr s qu il a t arr t jusqu ce qu il soit r par MISE EN GARDE Un mauvais fonctionnement d un palan peut cr er une situat...

Page 25: ...on La Soci t ne peut tre tenue responsable des applications autres que celles pour lesquelles l quipement de CM est recommand 1 chain fall 1 chute de cha ne SP CIFICATIONS Code produit Capacit nominal...

Page 26: ...sont survenus lors de l exp dition se r f rer l enveloppe de la liste de colisage sur la bo te pour la proc dure de r clamation ATTENTION L utilisation d une unit pr sentant des dommages externes vide...

Page 27: ...PECTION Pour maintenir un fonctionnement continu et satisfaisant une proc dure d inspection r guli re doit tre initi e afin que les pi ces us es ou endommag es puissent tre remplac es avant qu elles n...

Page 28: ...e bout bout et permettre une nouvelle section de prendre l usure L installation correcte de la cha ne de levage est d crite dans la section sur la cha ne de levage de la charge page 28 NOMBRE DE LIENS...

Page 29: ...nes des tourillons collier 3 et 5 tonnes goujon mort 3 et 5 tonnes REMARQUE Pour assurer une dur e de vie extra longue et des performances optimales veillez lubrifier les diff rentes parties du palan...

Page 30: ...la cha ne en vous assurant qu il n y a pas de torsion jusqu la goupille d extr mit libre et glisser la goupille dans le dernier maillon de la cha ne Faites glisser la goupille d extr mit libre dans l...

Page 31: ...crochet sup rieur et inf rieur MAINTENANCE PR VENTIVE En plus de la proc dure d inspection p riodique un programme de maintenance pr ventive devrait tre mis en place pour prolonger la dur e de vie du...

Page 32: ...A 22522A 622A 15 1 Goupille d extr mit libre comprend 2 goupilles fendues 22921A 22805A 22927A 22523A 622A 16 1 Rouleau de guide de cha ne 22922A 22806A 22827A 22524A 622A 17 1 Ensemble de crochet sup...

Page 33: ...du kit de verrouillage du kit de suspension du palan et du kit Dead End les pi ces individuelles ne sont pas disponibles pour les r parations Assemblage du crochet inf rieur sauf pour le crochet loqu...

Page 34: ...TY SET FORTH ABOVE SELLER MAKES NO OTHER WARRANTIES WITH RESPECT TO THE GOODS WHETHER EXPRESSED OR IMPLIED INCLUDING ANY WARRANTIES OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE QUALITY AND OR T...

Reviews: