23
Single & Double-Wide Hutch
SHELVING/TOWER ASSEMBLY
PREPARATION
Hutch towers may be installed in a variety of configurations, from
stand alone to multiple, contiguous, side-by-side units, potentially
sharing section-dividing vertical panels. Additionally, there are many
potential combinations of doors, drawers and other accessories for
both the top and bottom sections.
Each hutch tower is comprised of a minimum of: a set of vertical
panels, 3 fixed hutch shelves, and 3 cleats. Hardware is sold
separately. A hutch tower may also be complemented with one or
more doors, drawers, hampers, or baskets.
See “Drawer” in “Drawer and Door Assembly”
section for
instructions on assembly of each drawer box. However, for installing
drawer slides, please note that the front hole will
align-with system hole, but back hole will need to be drilled. Use
appropriate slide template and drill with 5mm self-centering bit. Also,
note new 18 in. deep drawer box, available in 24 in. or 30 in. width.
See “Hamper Door”, “Tower Door” (in “Drawer and Door
Assembly”), “Basket” (in “Accessory Assembly”), and “Toe
Kick” (in “Shelving/Tower Assembly”)
for specific installation
instructions on those items.
INSTALLATION
SINGLE HUTCH
1. Prior to assembling a hutch unit, ensure the unit will fit over
any existing baseboard trim.(Notch clearance is 5-5/8 in. high
by 1-1/16 in. deep.) If vertical panels will not fit over existing
baseboard, trim to fit before proceeding with assembly.
2. Place one vertical panel on a protective surface on the floor with
its inside facing up.
(See FIG. 1A)
NOTE:
Use a blanket or other cloth underneath panels if you are working on a
hardwood or tiled floor to prevent scratches on the melamine surface.
3. Insert 2 screw-in studs (or double-sided studs, if appropriate
for design) for each fixed shelf
(FIG. 1A)
into the appropriate,
corresponding holes in the first vertical panel.
4. Fit the shelves over the screw-in studs.
(FIG. 1C)
Fit the cleats/
toekick
(FIG. D)
into appropriate dowel holes and press until snug
with the first vertical panel. Tighten the cams.
DESCRIPTION
Panel Pack (2
Vertical panels
Cammed Fixed Hutch
Shelves
Standard 14 in. Shelf
(for top section)
Cleats
OPTIONAL DEPENDING
ON DESIGN:
Double-sided Studs (for
double-wide unit)
Top Shelf (for double-
wide unit)
Edgebanding Tape
Hamper Door and
Basket
Cabinet Doors
Baskets
Hutch Jewelry Drawer
Insert
PARTS
QTY
1+
3+
1
3
Back Panels
}
Shelving /Towers
Drawers and Doors
Adjustable Shelves
Molding
Baskets, Valet Rods,
Tie & Belt Racks, and
other accessories
Islands
Benches
ORDER OF ASSEMBLY
Summary of Contents for MasterSuite
Page 1: ...INSTALLER S Assembly Installation Reference Guide...
Page 12: ...12 Tower System SHELVING TOWER ASSEMBLY 12 43 FIG 1 FIG 2 FIG 3 FIG 4...
Page 13: ...13 FIG 5 FIG 6 FIG 7 a b b a Tower System SHELVING TOWER ASSEMBLY FIG 8 13 FIG 9 FIG 10...
Page 32: ...32 Hamper Door DOOR DRAWER ASSEMBLY FIG 1 FIG 3 FIG 2 FIG 4...
Page 39: ...39 FIG 12 Molding ACCESSORY ASSEMBLY FIG 11 FIG 8 FIG 9 FIG 10 FIG 7 GROO VE...
Page 50: ...50 FIG 4 FIG 9 Island ACCESSORY ASSEMBLY FIG 5 FIG 6 Top FIG 7 Bottom View FIG 8...