42
Valet Rod
ACCESSORY ASSEMBLY
INSTALLATION
Back Panels
Shelving /Towers
Drawers and Doors
Adjustable Shelves
Molding
}
Baskets, Valet Rods,
Tie & Belt Racks, and
other accessories
Islands
Benches
ORDER OF
STEP 1:
PULL ROD OUT FROM BACK
STEP 2:
MOUNT VALET TO PANEL
STEP 3:
PUSH ROD INTO FRONT
REPOSITIONING VALET
VA
LE
T
INSTALLING VALET
STEP 1:
REMOVE SCREW
FROM REAR OF ROD
STEP 2:
SLIDE ROD
OUT
FRONT
BACK
STEP 1:
PULL ROD OUT FROM BACK
STEP 2:
MOUNT VALET TO PANEL
STEP 3:
PUSH ROD INTO FRONT
REPOSITIONING VALET
VA
LE
T
INSTALLING VALET
STEP 1:
REMOVE SCREW
FROM REAR OF ROD
STEP 2:
SLIDE ROD
OUT
FRONT
BACK
Summary of Contents for MasterSuite
Page 1: ...INSTALLER S Assembly Installation Reference Guide...
Page 12: ...12 Tower System SHELVING TOWER ASSEMBLY 12 43 FIG 1 FIG 2 FIG 3 FIG 4...
Page 13: ...13 FIG 5 FIG 6 FIG 7 a b b a Tower System SHELVING TOWER ASSEMBLY FIG 8 13 FIG 9 FIG 10...
Page 32: ...32 Hamper Door DOOR DRAWER ASSEMBLY FIG 1 FIG 3 FIG 2 FIG 4...
Page 39: ...39 FIG 12 Molding ACCESSORY ASSEMBLY FIG 11 FIG 8 FIG 9 FIG 10 FIG 7 GROO VE...
Page 50: ...50 FIG 4 FIG 9 Island ACCESSORY ASSEMBLY FIG 5 FIG 6 Top FIG 7 Bottom View FIG 8...