2-6
Cisco TelePresence System 1100 Assembly, First-Time Setup, and Field Replaceable Unit Guide
OL-19695-01
Chapter 2 Cisco TelePresence System 1100 Room Recommendations
HVAC Considerations
degrees F. Within these guidelines and typical usage, diversity of 25 percent can be equated which lowers
cooling requirements and increases overall efficiency. HVAC considerations should be given from the
initial phase of choosing a room. Installing new cooling (or heating) systems can be time-consuming.
Note
Conditions not consistent with these recommendations or typical usage may require additional cooling.
Consult with an HVAC engineer to define building envelope and unique requirements. Additional
equipment such as data displays, document cameras, etc. will require additional cooling.
Table 2-3
CTS 1100 BTU Output with 25% diversity
Source
Typical KW
Typical Usage
BTUs/hr
System Power
0.75
1930
System Lighting
0.24
602
4 Participants (Avg)
0.26
666
3 Laptops (Avg)
0.17
422
Ceiling Lights for 130 sq ft
room (1.4w/sqft)
0.18
466
Total Typical Heat
Dissipation
4,100 BTU/Hr