![Chrysler Caravan 2003 Owner'S Manual Download Page 124](http://html1.mh-extra.com/html/chrysler/caravan-2003/caravan-2003_owners-manual_2606144124.webp)
TEST
ACTION
APPLICABILITY
14
Gain access to the connectors on the bottom of the IPM.
Disconnect the IPM C7 connector.
NOTE: Check connectors - Clean and repair as necessary.
Measure the resistance of the SIACM Run - Start Driver circuit between the IPM C7
connector and the Right SIACM connectors.
Is the resistance below 1.0 ohms?
All
Yes
→
Replace the IPM.
Perform AIRBAG VERIFICATION TEST - VER 1.
No
→
Repair the open SIACM Run - Start Driver circuit.
Perform AIRBAG VERIFICATION TEST - VER 1.
15
Measure the battery voltage.
Is the voltage above 30.0 volts?
All
Yes
→
Refer to Charging Category for the P1594 Charging System Too
High symptom.
Perform AIRBAG VERIFICATION TEST - VER 1.
No
→
Replace the Front Control Module.
Perform AIRBAG VERIFICATION TEST - VER 1.
16
WARNING: TURN THE IGNITION OFF, DISCONNECT THE BATTERY AND
WAIT TWO MINUTES BEFORE PROCEEDING.
Disconnect the Front Control Module.
NOTE: Check connectors - Clean and repair as necessary.
Measure the resistance of the SIACM Run-Start Driver circuit between the Front
Control Module connector and ground.
Is the resistance below 500K ohms?
All
Yes
→
Go To
17
No
→
Replace the Front Control Module.
Perform AIRBAG VERIFICATION TEST - VER 1.
17
Gain access to the connectors on the bottom of the IPM.
Disconnect the IPM C7 connector.
NOTE: Check connectors - Clean and repair as necessary.
Measure the resistance of the SIACM Run - Start Driver circuit between the IPM C7
connector and ground.
Is the resistance below 500K ohms?
All
Yes
→
Go To
18
No
→
Replace the IPM.
Perform AIRBAG VERIFICATION TEST - VER 1.
18
WARNING: IF THE SIDE IMPACT AIRBAG CONTROL MODULE IS
DROPPED AT ANY TIME, IT MUST BE REPLACED.
Disconnect the Left Side Impact Airbag Control Module.
NOTE: Check connectors - Clean and repair as necessary.
Measure the resistance of the SIACM Run - Start Driver circuit between the FCM
connector and ground.
Is the resistance below 500K ohms?
All
Yes
→
Go To
19
No
→
Replace the Left Side Impact Airbag Control Module..
Perform AIRBAG VERIFICATION TEST - VER 1.
100
AIRBAG
LOSS OF IGNITION RUN - START —
Continued
Summary of Contents for Caravan 2003
Page 24: ...NOTES xxiv ...
Page 64: ...NOTES 40 ...
Page 65: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 41 ...
Page 1080: ...C O N N E C T O R P I N O U T S 1056 CONNECTOR PINOUTS ...
Page 1119: ...10 2 2 BASE AUDIO SYSTEM S C H E M A T I C D I A G R A M S 1095 SCHEMATIC DIAGRAMS ...
Page 1123: ...10 3 3 FRONT ATC RHD S C H E M A T I C D I A G R A M S 1099 SCHEMATIC DIAGRAMS ...
Page 1125: ...10 4 COMMUNICATION S C H E M A T I C D I A G R A M S 1101 SCHEMATIC DIAGRAMS ...
Page 1130: ...10 6 EXTERIOR LIGHTING S C H E M A T I C D I A G R A M S 1106 SCHEMATIC DIAGRAMS ...
Page 1136: ...10 9 INTERIOR LIGHTING S C H E M A T I C D I A G R A M S 1112 SCHEMATIC DIAGRAMS ...
Page 1143: ...10 10 7 REAR BLOWER MOTOR S C H E M A T I C D I A G R A M S 1119 SCHEMATIC DIAGRAMS ...
Page 1145: ...10 11 MEMORY SYSTEM S C H E M A T I C D I A G R A M S 1121 SCHEMATIC DIAGRAMS ...
Page 1146: ...10 12 OVERHEAD CONSOLE S C H E M A T I C D I A G R A M S 1122 SCHEMATIC DIAGRAMS ...
Page 1147: ...10 13 POWER DOOR LOCKS RKE S C H E M A T I C D I A G R A M S 1123 SCHEMATIC DIAGRAMS ...
Page 1150: ...10 16 POWER LIFTGATE SYSTEM S C H E M A T I C D I A G R A M S 1126 SCHEMATIC DIAGRAMS ...
Page 1155: ...10 20 VEHICLE THEFT SECURITY SYSTEM S C H E M A T I C D I A G R A M S 1131 SCHEMATIC DIAGRAMS ...
Page 1157: ...10 21 WIPERS FRONT AND REAR S C H E M A T I C D I A G R A M S 1133 SCHEMATIC DIAGRAMS ...
Page 1158: ...NOTES 1134 ...
Page 1160: ...11 2 PCI BUS LAB SCOPE PATTERN C H A R T S A N D G R A P H S 1136 CHARTS AND GRAPHS ...