Section 5: Parts and Module Replacement
E Series 675/775 Service Manual
5-27
020-000546-04 Rev. 1 (04-2017)
6. Disconnect from ground stud located under Power Supply board.
7. Remove screws (2). See
8. Replace Power Inlet.
5.2.27IR Sensor
Replacement Time: 45 minutes
Procedure:
1. Remove Top Cover. See
2. Remove Top Shield. See
3. Disconnect from Main Board. See
.
4. Remove from pressure clip. See
.
5. Replace IR Sensor.
5.2.28Photo Sensor Board
Replacement Time: 25 minutes
Procedure:
1. Remove Top Cover. See
2. Remove Top Shield. See
3. Remove Lens Assembly. See
4. Disconnect harnesses (2).
5. Remove screws (2). See
6. Replace Photo Sensor Board.
5.2.29Shutter
Replacement Time: 25 minutes
Procedure:
F
IGURE
5-44 R
EMOVE
P
OWER
I
NLET
F
IGURE
5-45 IR S
ENSOR
F
IGURE
5 46 P
HOTO
S
ENSOR
B
OARD
Summary of Contents for DHD675-E
Page 1: ...E Series 675 775 S e r v i c e M a n u a l 020 000546 04...
Page 2: ......
Page 3: ...E Series 675 775 S e r v i c e M a n u a l 020 000546 04...
Page 12: ......
Page 32: ......
Page 108: ......
Page 110: ......
Page 112: ......
Page 113: ...Appendix C Schematic Diagrams E Series 675 775 Service Manual C 3 020 000546 04 Rev 1 03 2017...
Page 121: ......