![background image](http://html1.mh-extra.com/html/christie/dhd675-e/dhd675-e_service-manual_2603820053.webp)
Section 5: Parts and Module Replacement
E Series 675/775 Service Manual
5-7
020-000546-04 Rev. 1 (04-2017)
5.2.7 Top Shield
Replacement Time: 15 minutes
Procedure:
1. Remove Top Cover. See
2. Remove screws (16) and lift shield from projector chassis. See
.
5.2.8 Color Wheel
Replacement Time: 5 minutes
Procedure:
1. Loosen captive screws (2) and lift lamp access cover. See center of
.
2. Loosen captive screws (2) and remove Color Wheel. See
3. Replace Color Wheel.
NOTE:
System will detect (via software) type of color wheel when installed.
4. Perform the procedure in
3.6.3 Color Wheel Index Adjustment
5.2.9 Cooling Fan - Lamp 1
Replacement Time: 25 minutes
Procedure:
1. Remove Top Cover. See
2. Remove Top Shield. See
3. Disconnect harness (Fan 7) from Connector-B Board.
4. Remove harness cable from retaining clips.
5. Remove screws (2). See
.
F
IGURE
5-7 T
OP
S
HIELD
Summary of Contents for DHD675-E
Page 1: ...E Series 675 775 S e r v i c e M a n u a l 020 000546 04...
Page 2: ......
Page 3: ...E Series 675 775 S e r v i c e M a n u a l 020 000546 04...
Page 12: ......
Page 32: ......
Page 108: ......
Page 110: ......
Page 112: ......
Page 113: ...Appendix C Schematic Diagrams E Series 675 775 Service Manual C 3 020 000546 04 Rev 1 03 2017...
Page 121: ......