74
DWU951 (DD1-WU80P/81P) / DWX951 (DD1-WX80P/81P) / DXG1051 (DD1-X100P/101P)
DWU951/DWX951/DXG1051 Service Manual
020-000674-01 Rev.1 (01-2014)
Page 74 / 118
䖃
POWER UNIT1 BALLAST
Disassembling
1) Turn over the ballast holder, disconnect CNLP1 and
CNBL1 from POWER UNIT1 BALLAST and put the
cables away from the holes.
2) Remove 2
V
crews to detach POWER UNIT1 BALLAST
and the insulating sheet from the holder.
3) Separate POWER UNIT1 BALLAST and the partitions.
NOTE
Remember to detach the partitions and re-use them with
new POWER UNIT1 BALLAST. The service parts do
not include the partitions.
1) Attach firmly the partitions on POWER UNIT1 BALLAST
LQWKHVDPHZD\DV
POWER UNIT2 BALLAST.
2) Put POWER UNIT1 BALLAST on the ballast holder and screw down.
3) Connect CNLP1 and CNBL1 to POWER UNIT1 BALLAST and wire them as below.
Assembling
Ballast
holder
POWER
UNIT1
BALLAST
Insulating
sheet
CNBL1
Ballast
holder
Insulating
sheet
Bottom View
Wire CNBL1 through this hole. Confirm there is
no excess length between CNBL1 and the hole
Wire CNLP1
ATTENTION
Be careful not to confuse
CNBL1 (5Pin-5pin) with
CNBL2 (5Pin-6Pin).
CNLP1
CNBL1
T3x12, black screws
POWER UNIT1
BALLAST
Wire CNLP1
through this hole
Be careful not to confuse
CNBL1 (5Pin-5pin) with
CNBL2 (5Pin-6Pin).
Torque: 0.68
䡚
0.88N
䞉
m
Summary of Contents for DD1-WU80P
Page 1: ...DWU951 DWX951 DXG1051 Service Manual 020 000674 01...
Page 2: ......
Page 149: ......
Page 150: ......