Freeze-dryer Epsilon 1-4 LSCplus
Freeze-dryer Epsilon 2-4 LSCplus
Index
Version 07/2022, Rev. 3.0 of 20/07/2022
• sb
147 / 152
Translation of the original operating manual
13 Index
A
Access protection....................................... 77
Accessories ............................... 39, 114, 122
Accident prevention ............................. 25, 28
Accident prevention regulations ................. 25
Accidents ................................................... 37
Acids .................................................... 12, 38
Acids (hazards) .......................................... 32
Actual values of the current process .......... 58
Additions .................................................... 38
Administration ............................................ 75
Aeration ..................................................... 46
Aeration (connection) ............................... 136
Aeration medium, preselection ........... 72, 106
Aeration valve, cleaning and care ............ 117
Aeration valve, malfunction ...................... 111
Aeration, stoppering, storage ..... 98, 106, 145
Ambient conditions ................................... 136
Ambient temperature ......................... 45, 136
Apparent power ......................................... 17
Areas of responsibility ................................ 25
Automatic aeration, stoppering, storage ... 106
Azides ........................................................ 12
Azides (hazards) ........................................ 32
B
Beeper ....................................................... 76
Behaviour of the pressure control valve in the
case of insufficient ice condenser cooling
............................................................... 77
Burns ......................................................... 37
Button "Set values: view/edit" ..................... 58
Button "Standard unit test" ......................... 64
Button "Stop" ............................................. 69
C
Calculation of the control set value and of the
gradient for the temperature ................. 137
Calculation of the control set value for the
vacuum ................................................ 137
Capacity test -30°C .................................... 66
Capacity test -50°C .................................... 67
CE mark in compliance with the directive
2006/42/EC ............................................ 23
Chamber, cleaning and care .................... 115
Changing of operating supplies .................. 38
Chemical burns .......................................... 37
Chemical reactions .................................. 122
Circuit diagram ......................................... 136
Cleaning .................................................... 38
Cleaning agents ............................... 114, 123
Cleaning the accessories ......................... 114
Cleaning the freeze-dryer ......................... 114
Click on touch ............................................ 77
CO
2
equivalent ......................................... 136
Comparative pressure measurement .............
............................................... 97, 105, 145
Compatibility test.................................. 25, 26
Compliance with the EC health and safety
directives ................................................ 25
Condensate, contaminated (hazards) ........ 33
Conditions for switching to the next section 91
Configuration of sensors ............................ 79
Connection........................................... 38, 46
Connection (hazards) ........................... 29, 45
Connection requirements ......................... 135
Contaminated condensate (hazards) ......... 33
Contaminated defrosting water (hazards) .. 33
Control switch ............................................ 36
Control system type ................................... 86
Controlled Nucleation LyoCoN ................. 104
Conversions ............................................... 38
Cooling system ........................................ 136
Copying a program .................................. 102
Copyright ................................................... 13
Corrosion ......................................... 114, 122
Cost estimate ........................................... 133
Cracks ..................................................... 122
Creating a blank program ........................... 93
Creating a program .................................... 93
Customer-provided fuses ........................... 46
D
Damage to the materials of construction .. 114