background image

 

 

DESIGN | MANUFACTURE | SUPPORT 

 

 

 

4.2

 

Connect 

 

CONNECT 

Press the

 Connect

 button to hear the connection status for all enabled communication pathways to the 

monitoring centre. When flashing blue, it can be pressed to send a 

‘Daily Check’ to monitoring, if 

configured to do so. 
 

 

 

All enabled connections are connected and available.  

 

 
 

 Solid orange when starting up and first connecting to the cellular network. 

 Flashes orange to let you know there is a connection that is not working, (but there is still one 

able to be used to send an alert). This function is only applicable when there is more than one 
pathway enabled to send a report on, therefore does not apply for SEVEN L and SEVEN L-X base 
units. 

 

 

The red flash indicates there are no connections to monitoring, an alert will not work. 

 

 

Flashes blue when 

a ‘Daily Check’

 is required. Press the button to send a report to monitoring, 

and the light will return to normal.  

 

 

No light 

 base unit is off. 

 

INSTALLER 

INFO 

 
 
 

4.2.1

 

Cellular Connection at Start-up / Reset 

The Connect button will turn solid orange for a short period of time when connecting to the cellular 
network; this will occur every time SEVEN starts up or is reset. It will typically take about 15 seconds to 
connect to a local cellular tower, but sometimes this process can take up to one minute.  

If an issue is detected, the light will change colour and flash to indicate a connection issue.  

4.2.2

 

Connection Status 

Press the Connect button to hear what communication pathways are enabled along with the current 
status of the connection. Depending on the base unit and configuration, these could include any 
combination of Cellular A, Cellular B, WiFi or Ethernet. 

4.2.3

 

Communication Pathway Testing 

Press and hold the Connect button to initiate the Communication Pathway Test. Each unique pathway 
that has been enabled will be used to send a test report to monitoring to confirm it is available.  As the 
test runs, SEVEN announces each of the pathways t

hat it is testing along with the “

Pass

” or “Fail”

 result 

for each test.  

4.2.4

 

Daily Check 

Daily Check is an optional setting and can be set to occur after power on/restart, or at a predefined time 
set in the configuration.  

The Connect button will flash blue to indicate that it should be pressed to 

send a ‘Daily Check’ 

report to 

monitoring. Press the Connect button and SEVEN will announce, 

“Sending you

r Daily Check

”. 

The blue 

flashing will be cleared once the button has been pressed. 

Summary of Contents for SEVEN - 3G PERS

Page 1: ...Manual and Installation Process The future of telecare base units 4G 3G cellular communication SEVEN offers superior functions and reliability while operating with existing Chiptech personal help butt...

Page 2: ...vice 20 9 2 Active Inactive RF Devices 20 10 RF Test 21 10 1 RF Test Mode 21 10 2 RF Test Process 22 11 Reminders 23 11 1 Reminder Reports 23 11 2 Additional Voice Phrases 23 12 Messaging 24 12 1 SMS...

Page 3: ...M Wi Fi and Ethernet it includes comprehensive hardware for future proof applications 2 SEVEN LE X is the extended aerial version it has no internal cellular antennas and must have an external cellula...

Page 4: ...notifications If there is a message to be heard or an action required these buttons will change colour to orange red or blue Power Solid green when the base unit is turned on and operating as expected...

Page 5: ...p to five years Backup battery life is up to 70 hours The label placed here contains standards To Wall Mount Use the two available screw slots to mount SEVEN to the wall or wall mount bracket Expansio...

Page 6: ...to date list of suppliers 3 2 How to Attach the Aerial Attach the external aerial directly or with a coax cable to the SMA connector which is located on the back panel of SEVEN X This only needs to b...

Page 7: ...mended to start SEVEN on battery If you need to do so press the Power button for three 3 seconds SEVEN will speak and the Power button will flash orange 4 1 2 Turn Off Unplug the SEVEN plug pack from...

Page 8: ...occur every time SEVEN starts up or is reset It will typically take about 15 seconds to connect to a local cellular tower but sometimes this process can take up to one minute If an issue is detected...

Page 9: ...at a task be performed Press to hear the request Flashes red when there is a Critical warning message for e g evacuation notices or emergency events Flashes blue when a Pendant Test is required No lig...

Page 10: ...erently when using Installer Mode In the Installer Setup menu press the Cancel button to move to the next setting option NOTE The Cancel button cannot be used to exit the Installer Setup To exit press...

Page 11: ...o it can be uniquely identified CONNECT and INFO and CANCEL Installer Setup To access the Installer Setup press and hold the Connect Info and Cancel buttons at the same time for three 3 seconds SEVEN...

Page 12: ...SEVEN which then sends an alert to the monitoring centre summoning help for the user Pearl Advanced has an elegant discrete casing that is hot waterproof and can be worn in the bath or shower Pearl A...

Page 13: ...ter edge of GO keep the user informed as their alert for help is being sent They can speak to an operator over the handsfree speakerphone GO can be paired with a SEVEN base unit utilising the same Pea...

Page 14: ...ch as computers televisions touch lamps old cordless phones Also avoid placing SEVEN next to large metal objects e g a water cylinder microwave or fridge Remember to use the line of sight rule when in...

Page 15: ...e Internet push the Ethernet cable through the cable hole at the back of SEVEN as depicted and into the Ethernet socket marked in the base of the cable cavity Push the cable from outside SEVEN until y...

Page 16: ...lar A and B you will need to adjust the unit s configuration to single SIM only See Section 14 1 Step 6 The Pearl personal help button supplied in the box will already be learned into SEVEN If you do...

Page 17: ...o end the process SEVEN will announce RF Test end Step 8 If you only have a single communication pathway for connecting to monitoring i e one SIM card no Ethernet skip to Step 9 If you have more than...

Page 18: ...ice messages and point out the flashing Help button while SEVEN is connecting to monitoring Wait for the operator to phone back and let the speakerphone pick up so the customer can hear the operator s...

Page 19: ...n to move to the next setting in the menu To exit press the Power button If left the Installer Setup Menu will timeout after two 2 minutes 8 1 Installer Setup Options Depending on the configuration fi...

Page 20: ...Pearl SID and GO SEVEN will announce when a device has been successfully learned into the base unit as well as its allocated zone number i e One RF Learned Zone 1 Your organisation may require you to...

Page 21: ...in an emergency it may have been found and mixed up with the new one 3 The monitoring centre gets a Failed to test report after a device replacement but the RF device works fine when the client presse...

Page 22: ...und level as well so the customer is covered in the event of a fall 10 2 2 Range Testing with SID Devices All fitted devices environmental monitoring products and wall mounted buttons should be tested...

Page 23: ...n acknowledged can also be setup to occur Ticking the Send Not Ack report brings up a timing window where you can specify in minutes how long the reminder will repeat before a reminder not acknowledge...

Page 24: ...ID of the base unit then the msg string format outlined below CSIDmsg msg1 msg2 msg3 e g 1234msg C 17 15 A 0 SEVEN with a CSID of 1234 will announce the Critical messages 17 then 15 and zero is used t...

Page 25: ...y mode and during silent hours 12 3 Pre recorded Voice Phrases The messages that can be announced are selected from the message list Each message is followed by a short pause so they sound correct whe...

Page 26: ...e pre alarm will sound as usual Reminders and Critical messages will announce at any time Please Note Critical messages received by the base unit will announce and repeat during silent hours 14 Connec...

Page 27: ...entre SEVEN with a single SIM card fitted will check the network every ten minutes If six of these checks in a row are detected as unavailable then the Connect button will flash orange or red dependin...

Page 28: ...r ends the call SEVEN will automatically hang up SEVEN will answer incoming calls for ten minutes after an alert for help After each incoming call is answered the speakerphone will automatically pick...

Page 29: ...Cellular A 1 Following each communication pathway test the unit will announce either Pass or Fail When all unique pathways have been tested successfully the alarm will announce Communication Pathway T...

Page 30: ...eivers Pearl personal help button batteries have an expected life of up to six years and cannot be replaced A Pearl with a low battery is not able to be learned into a base unit Pearl Advanced Fall De...

Page 31: ...o connect to an alarm you will require a SERMOD cable an ERICA or SEVEN router and a computer with a USB port and access to the internet To perform a remote connection please refer to the Chiptech Wiz...

Page 32: ...d A solid red Power button indicates that the base battery has been removed or is no longer functioning Remove all cables before opening the battery cover Check that the battery pack is still connecte...

Page 33: ...tton is flashing red The Connect button flashes red to indicate there are no connections to communication pathways and an alert will not be able to be sent to monitoring Press the Connect button this...

Page 34: ...nce There is a problem learning this RF Device The RF device will not be learned You will need to learn in a different RF device pendant Note This is the same message that is announced when there is n...

Page 35: ...is the sole property of Chiptech and Chiptech International Limited Chiptech and may only be used with prior permission inside your company or organisation for the exclusive purposes of evaluating and...

Reviews: